Laserfiche WebLink
Mountain House Specific Plan III <br /> ...........................................................................................................—............................................................. <br /> Table 5-1: Specific Plan III Student Generation — <br /> Proposed K-8 K-a 9-12 $42 <br /> Acres DU Students/ Students at Students/ Students at <br /> I J Unit Buildout Unit Buildout <br /> Neighborhood A/B <br /> Very Low Density Residential (R/VL) 61.6 117 0.559 65 0.179 21 <br /> Low Density Residential (R/L) 98.0 392 0.559 219 0.179 70 <br /> Medium Density Residential (R/M) 176.9 1103 0.559 617 0.179 197 <br /> Medium High Density Residential(R/MH) 10.0 140 0.338 47 0.0432 6 _ <br /> Total 346.5 1752 947 295 <br /> Neighborhood D <br /> Medium Density Residential (RIM) 48.8 342 0.559 191 0.179 61 _ <br /> High Density Residential (R/H) 10.8 208 0.338 70 0.0432 9 <br /> Total 59.6 550 261 70 <br /> Grand Total(Neighborhoods AIB,D) 406.1 2302 1208 365 <br /> 5.2.3 Implementation Measures <br /> a. The school district's School Facilities Master Plan shall accurately document its existing facilities, — <br /> provide future school facilities projections (both short and long term),demonstrate the use of the <br /> current and projected revenues which are anticipated to meet those needs,document the district's _ <br /> reasonable good faith efforts to seek all available funding,and provide a current representation <br /> regarding the prospects for seeking and/or obtaining funds in the reasonably foreseeable future. <br /> b. School sites and public infrastructure and services shall be provided to allow opening of schools as <br /> scheduled in the school plan. This will include requiring installation of sidewalks along all streets at <br /> the time of construction to ensure that there will always be safe routes to an existing school as the <br /> neighborhood builds out. <br /> c. K-8 School Openings. Although subsequent mitigation agreements with school districts will <br /> determine specific mitigation and phasing requirements,the following shall be targets for phased <br /> openings of each new K-8 school as determined by the school district: — <br /> • Opening Phase I of the first K-8 when there are approximately 225 students. <br /> • Opening Phase 2 of the first K-8 when there are approximately 600-700 students. <br /> • Opening Phase 1 of each additional new K-8 when the most recently opened K-8 is near capacity. <br /> • Opening of Phase 2 of each additional new K-8 when it nears capacity or when there are — <br /> approximately 600-700 students on each new Phase 1 site. <br /> d. To facilitate pedestrian circulation and reinforce neighborhood structure,the K-8 sites shall be located _ <br /> within'/4 miles walking distance of all homes in the neighborhood. In Specific Plan III, the two K-8 <br /> sites of 32 acres will be located as shown on the land use map and school plans. Upon the <br /> 5-4 Draft 03/14/05 <br /> ........................................................................................................................................................................... <br />