Laserfiche WebLink
Mountain House Specific Plan III <br /> ........................................................................................................................................................................... <br /> n. The K-8 school sites designated on the Tentative Map shall be dedicated to the Lammersville — <br /> Elementary School District as required in the school agreement between the applicant and <br /> Lammersville Elementary School District. The condition shall be met prior to approval of First Final _ <br /> Map in Neighborhood AB or as set forth in the school agreement. <br /> o. The School funding agreements between the applicant and Lammersville Elementary School District <br /> and Tracy Unified School District shall be implemented to provide interim and permanent funding for <br /> school facilities,as evidenced by certificates of compliance from this jurisdiction stating that the <br /> developer has complied with funding requirements as per the agreements.The condition shall be met <br /> prior to approval of Final Maps. <br /> 5.2.4 School Support Facilities and Services <br /> 5.2.4.1 Implementation Measures <br /> a. Adequate interim facilities will be provided, including relocatable classrooms and support facilities at <br /> existing schools as per school funding agreements. <br /> b. Interim use of buses and other special vehicles shall be provided for student transportation services <br /> based on student generation rates, as contained in either the Master Plan,the School Facilities Master <br /> Plan, or school funding agreements. Once schools within a safe walking distance are open,buses and <br /> other support vehicle needs shall be supplied as required. Shared use with any public transit shall be <br /> maximized. <br /> c. Acreage and facilities for interim and permanent School District Administration Offices shall be <br /> provided as specified in the School Facilities Master Plan and school funding agreements. <br /> 5.2.5 Community College <br /> The Delta College Project is projected to be constructed in four phases over a 20-year time frame. The <br /> initial enrollment at the completion of Phase 1 would be 3,500 students,increasing to an enrollment at full <br /> buildout of 12,000 students. At full buildout, it is anticipated there would be 557,000 gross square feet of <br /> development at the site,4,000 parking space and 532 faculty and staff employed at the College. An <br /> additional 10.9-acre parcel adjacent to Mountain House in Alameda County has been acquired to buffer <br /> the college from nearby agricultural operations. — <br /> 5.2.5.1 Implementation Measures _ <br /> a. The applicant shall maintain a temporary buffer within the community to include a 100-foot setback <br /> between the edge of development and ongoing agricultural operations as the project builds out. <br /> b. Improvement Plans to be approved by DCRC and MHCSD prior to onsite construction or grading. <br /> 5-6 Draft 03/14/05 <br /> ........................................................................................................................................................................... <br />