Laserfiche WebLink
Mountain House Specific Plan III <br /> ........................................................................................................................................................................... <br /> 5.4 Library Services <br /> 5.4.1 Master Plan Summary <br /> The San Joaquin County General Plan requires new communities exceeding a population of 10,000 to <br /> have a branch library.The Master Plan provides for the provision of library services on a phased basis. <br /> The bookmobile will be funded, along with leased facilities for library operations,to serve the initial <br /> residents in the community until the population necessitates construction of a full-service branch library. <br /> The first phase of a new central library facility will be built when approximately 3,500 residential units <br /> have been constructed, the second phase when 7,500 units are completed,the third phase when 11,000 <br /> units are completed,and the fourth and final phase when 14,500 units are completed. The library shall <br /> meet the specifications of the"Standards for Branch Library Buildings"Study,and will contain a <br /> minimum of 118,000 volumes including 176 periodicals and 2,000 audio and visual recordings. Books <br /> shall be provided at a ratio of two per capita and other facilities on a prorated basis. <br /> 5.4.2 Specific Plan III Description <br /> The central library facility will be located in the Town Center outside of Specific Plan III area.Each K-8 <br /> school may enter into a joint-use agreement with the Stockton-San Joaquin County Library System to <br /> provide neighborhood library services. <br /> 5-8 Draft 03/14/05 <br /> ........................................................................................................................................................................... <br />