My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004916
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
18353
>
2600 - Land Use Program
>
PA-0500142
>
SU0004916
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 9:43:57 AM
Creation date
9/5/2019 10:44:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004916
PE
2638
FACILITY_NAME
PA-0500142
STREET_NUMBER
18353
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
ENTERED_DATE
3/17/2005 12:00:00 AM
SITE_LOCATION
18353 W GRANT LINE RD
RECEIVED_DATE
3/15/2005 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\18353\PA-0500142\SU0004916\COLLEGE PRK SP III.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
865
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
significant temporary construction noise, <br /> significant stationary source noise, <br /> significant long-term traffic noise, and <br /> significant incompatibility of proposed uses with predicted on-site noise levels. <br /> As indicated under"Transportation"above,this alternative would generate more traffic than the proposed project. <br /> Therefore,this alternative would generate more long-term traffic noise than the proposed project.This alternative <br /> would include more commercial/industrial development than the proposed project and thus would generate more <br /> stationary source noise than the proposed project.[Greater] <br /> Visual Quality <br /> Both the MHMP Buildout Alternative and the proposed project would: <br /> convert the project site from an agricultural to an urban setting(significant impact); <br /> include street widening that would require the removal of approximately 200 mature trees along both sides of <br /> Grant Line Road, altering the visual character of the area(significant and unavoidable impact); <br /> require the development of 7-foot sound walls(the MHMP maximum) along portions of Grant Line Road and <br /> DeAnza Boulevard(less-than-significant impact); and <br /> include the development of outdoor lighted community park facilities(less-than-significant impact). <br /> _ In addition,this alternative would require development of a 30-acre interim recycled water irrigation pond on the <br /> Pombo property,resulting in a significant impact on the scenic vista similar to that of the proposed project. <br /> Therefore,the MHMP Buildout Alternative would result in visual quality impacts similar to those of the proposed <br /> project.[Similar] <br /> 5.2.3 TRAFFIC/AIR EMISSIONS REDUCTION ALTERNATIVE <br /> DESCRIPTION <br /> Under the Traffic/Air Emissions Reduction Alternative,the project site would be developed as proposed under the <br /> College Park project, except as follows: <br /> Five of the medium-density residential(R/M)parcels would instead be designated as medium-high residential <br /> (R/MHâcluster)and be developed with clustered condominiums rather than single-family residential units <br /> such that the total number of residential units within each of these parcels would not be greater than the <br /> number proposed under the College Park project(i.e.,overall number of units would stay the same). <br /> 0 One of the medium-density residential(R/M)parcels would instead be designated as office commercial (C/O) <br /> and developed with office commercial uses. <br /> One additional neighborhood commercial(C/1)center would be designated in the place of some of the <br /> designated medium-density residential(R/M)uses. <br /> As indicated in Table 5-1,this alternative would include 2,201 residential units, 5 acres of neighborhood <br /> commercial,458,830 sf of office commercial, and 1,507,260 sf of limited industrial,compared to the proposed <br /> project,which would include 2,302 residential units, 1.5 acres of neighborhood commercial, 256,130 sf of office <br /> commercial,and 1,507,260 sf of limited commercial.This alternative would include fewer residential units and <br /> more neighborhood and office commercial uses than the proposed project.This alternative would also include a <br /> College Park at Mountain House Specific Plan III Draft EIR EDAW <br /> San Joaquin County 5-15 Alternatives to the Proposed Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.