Laserfiche WebLink
Cine Park at Mountain House SpedBe Plu IIT <br /> anon Monitoring and Repordng Program <br /> it Mitigation Measure Thing/Schedule ImPlemenWW Implementation&Verification <br /> R"wsiblity Action Date <br /> Completed <br /> biologist within, the 2 weeks before construction <br /> or tree removal begins.If no active nests are <br /> found,no fiuther..mitigatiou,shall be.required. <br /> < If active nests ase found,impacts shall be <br /> avoided by estallilisht of apa ltitffers. <br /> No project activity shall commpoe within the <br /> buffer arca until a qualified biologist <br /> that the nest is no longer active, DFG guidelines <br /> recommend implementation of 4.25- or 0.5-mile <br /> buffers,but the size of the buffer may be adjusted <br /> if a qualified biologist and DFG determine-it <br /> wouiA not be likely to adversely affect the nest. . <br /> Mon koring of the nest by a qualified biologist <br /> may be rcqired if the activity has potential to <br /> adversely meet ills nest. <br /> Burrowing Owl Before construction SJCOG,in <br /> < Befogs project activity,focused surveys for, consultation with DFG <br /> burrowing owls shall be opted by a qualified <br /> biologist is areas of suitable habitat.on and <br /> witbin 7ZO feet 9f the eject site,Surveys shad <br /> be,wvo acc <br /> wted in won*"with DFG protocols <br /> < if no occupied burrows am bund in the survey <br /> Area,a letterreport documenting survey methods <br /> andduaga"be submdto DFG,.and no <br /> Ruth"mitigation is necessary, <br /> < If.an occupied burrow with:an active.nest is <br /> found,impacts shall-be minimized by <br /> establishing a 250-foot buffer area around the <br /> burrow.No project activity shall occur within the <br /> © buffer area until a qualified biologist confirms <br /> that the nest is no longer active,The sins of the <br /> buffer area may be adjusted if a qualified <br />