My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006456
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
18353
>
2600 - Land Use Program
>
PA-0600642
>
SU0006456
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 8:51:42 AM
Creation date
9/5/2019 10:44:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006456
PE
2691
FACILITY_NAME
PA-0600642
STREET_NUMBER
18353
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
209450014 15
ENTERED_DATE
3/1/2007 12:00:00 AM
SITE_LOCATION
18353 W GRANT LINE RD
RECEIVED_DATE
2/26/2007 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\18353\PA-0600642\SU0006456\IMP PLN.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IM <br /> v <br /> °. College Park at Mountain House Specific Plan III <br /> 3 Mldgadon Monitoring sad Reporting Program <br /> Implementation Implementation&Verification <br /> Mitigation re Tinring/Schedule Date Responsibility Action C,omple <br /> 43 <br /> ted <br /> biologist and DFG.determine:it would not be <br /> likely to adversely affect ft.nesting pair.DFG <br /> "also be consulted to dCoprmine if it is <br /> necessary to temporarily Preserve foraging <br /> babitat(in addition to the buffer area)until the <br /> nest is no longer active. <br /> < If feasible,250-foot buffer areas.shall also be <br /> established around all other occupied burrows.If <br /> this is not feasible,DFG shall be consulted to <br /> determine whether smaller buffer-areas and/or <br /> relocation of owls is necessary.Relocation may <br /> include passive techniques,such as use of Qme- <br /> way doors to encourage owls to prove to <br /> Co alternative burrows outside the impact area,or <br /> capture and movement of owls to specific ' <br /> mitigation sites. <br /> Other Nesti ig RaptorsBefore construction SJCOG,in <br /> < If project construction begins during the raptor (surveys shall be consultation with DFG <br /> nesting season(February 15 to August 31),Pre- .' conducted 2 weeks <br /> construction suryeys shall be conducted by a prior to construction <br /> qualified biologist in areas of suitable nesting_ activities) <br /> ot habitat within 540 fact ofproject activity.Surveys <br /> sball be cow within 2 weeks before the <br /> b*nuirtg,of mon or Om roWvaL If no <br /> active nests are found,no furter m l igafion shall <br /> be <br /> < If active nests are found,impacts shall be avoided <br /> by establishment of appropriate buffers.No <br /> project activity shall commence within the buffer <br /> area until a qualiified biologist confirms that the <br /> nest is no longer active.DFG guidelines <br /> recommend.implementation of 540-foot es, <br /> but the size of the buffer may be adjusted if a <br />
The URL can be used to link to this page
Your browser does not support the video tag.