Laserfiche WebLink
x <br /> v <br /> College Park at Mountain House Specific Plan M <br /> Mitigation Monitoring and Reporting Program <br /> Implementation&Verification <br /> Implementation <br /> Mitigation Measure Thing/Sdieduls Responsibility Action Date <br /> Completed <br /> at least 5 consecutive days from the time of the <br /> W observation,to allow anykit fox accupymg ttbe. <br /> den to move to atwtber Jocadon.If it is not a natal <br /> or pupping den,use of the den can be discouraged <br /> o$ during this period by ply plugging its <br /> mmince(s)with soil in such a manner that any .., <br /> animal cau escape easily.The den may be <br /> destroyed when,in the judgment.of a qualified <br /> biologist,it is no longer occupied by a kit fox or it <br /> is temporarily vacant Methods for den desmictio <br /> shall be in accordance with USF_ WS <br /> recommendations. <br /> CD < Occupied natal or pupping dens shall not be <br /> destroyed,until the adults and pups have vacated <br /> the den and then only after consultation with <br /> USFWS.A 250-foot buffer zone shallbe <br /> maintained around natal dens until the biologist <br /> des that the den has been vacated. <br /> (D Additional provisions of the Standardized. . <br /> Recomma dations for Protection of the Soh <br /> Joaquin Kit Fox Before or During Ground <br /> Disturbance(USFWS 1999),inehuling those <br /> for educating construction workers regarding <br /> kit fox,keeping heavy equipment operating at <br /> safe speeds,and checking oonstrwion pipes <br /> for Hi fox occupation during'construction, <br /> .shall also be maplemefied. <br /> Jurisdictional waters of the United States Before Construction SJCOG,in <br /> < The College Park Developers shall implement coordination.with <br /> Mitigation Measure 4.10-10. DFG,USACE and/or <br /> RWM <br /> 4.11. TRAFFIC <br /> San Joaquin County <br /> 4.11-1 Transportation—Effects on 2025 Cumulative Before construction <br />