Laserfiche WebLink
College Park at Mountain House Specule Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Mitigation Measure Timinglftedule impiementadon lmpiementation&Verification <br /> Responsibility Action Data <br /> Completed <br /> With-Project Conditions an Anticipated Network <br /> For consistency with previouslyadopted roadway <br /> standards,the County shall adend the standard of <br /> LOS D to the seonrent of Byron Road east of Grant <br /> co Line Road. <br /> Because Byrom Road is a major regional arterial <br /> serving the aresThe County shall extend <br /> impdoua of Moulin House Master Pian <br /> _ (*WYEAA ,A itlgahonmeasum 4.12-5(e)to iippIy to <br /> Byron Road east of CA=a Lige Road <br /> 4.12. AIR QUALITY <br /> 4.12-1 AhQuatty—Generad"of Temporary,Short- Before construction SNAPCD,in <br /> Term Construction Emdoioas of,Criteria Air begins and during conjunction with the <br /> PeUubnts construction developer <br /> The College Park developers shall implement the latest <br /> veaion:ofthe SJVAPCD construction-emissions <br /> control'measures during construction(see"Regulatory <br /> Setting,",above): <br /> The latest version of the San Joaquin Valley Air <br /> Pollution Comir+ol Dish(SJVAPCD)covb* <br /> measures are included m t*i u jar;Assessing and <br /> Wz gadng kr Qera*lmpicts(SJVAPCD 1998)and <br /> repeated in the"Rep&soiry Setting"subsection.The <br /> SNAPCD pally mviso.,its contiolm aswm <br /> Developmeot.uader College,Pack would be required by <br /> the SJVAPCD to implement the .version of the <br /> measures at the time individual development <br /> Applications are received by the County for <br /> development under College Park. <br /> 4.12-2 Air Quality—Potential Generation of Toric Air Before construction SNAPCD,in <br /> Contaminants(IACs) begins and during conjunction with the <br /> s ► Asbestos--The College Park developers shall construction developer <br /> implement Mitigation Measure 4.9-1. <br />