Laserfiche WebLink
� o <br /> � a <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> lrr�plemenlation Implementation&Verification Data <br /> Mitigation Measure TimingiSdtiedule ResponsURY Action <br /> Completed <br /> ► Mobne,%uree TAC Emissfions---The College <br /> Park applicants for industrial or commercial land <br /> uses shall coordinate vfith the SIVAPCD.to <br /> assess situations i`ni which toxic riaic,from diesel <br /> particulate matter(PM)may' occur and to review <br /> '4 methodologies that may bep me available to <br /> estimate the risk.The,developers shall implement <br /> any project level measures adopted by the <br /> SIVAPCD to reduce mobile-source TACs <br /> emissions: <br /> 4,12-3 Air Quality--Posdble Temporary and Occasional . Before and during SICCDD,in <br /> Exposure of New Seusidve Uses to Odors construction conjunction with the <br /> N Ile College Park developers shall not develop any developer <br /> neve residential uses within 1,000 feet of the two <br /> existing on-site dairies until such time as the diaries <br /> cesse operation and the dairy waste ponds and animal <br /> refuse piles are removed. <br /> s 4.12- Air Quality—Increased Long Term Regional Before construction SIVAPCD,in <br /> -o Emissions of Criteria Pollutants begins and during conjunction with the <br /> The College Paxk developers shall implement all of construction developer <br /> the mitigation measures as recommended in the <br /> Gude for Assessing and M#fgating Air Quality. <br /> Impacts(SIVAPCD 1998).Many of these measures <br /> are a mdy.inchmded in the proposed project design <br /> and/or ane already,required by the.W and by <br /> mitigation in the NMO and Delta.College EIRs.. <br />