Laserfiche WebLink
College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&Verification <br /> Mitigation Measure TiminglSchedule Responsibility ACODn Date <br /> Completed <br /> land uses,the operation of on-site landscape <br /> x maintenance equipment shall,be limited to the <br /> least noise-sensitive periods of the day,between <br /> Ile hours of 1:00 am,and 10:00 p.m. <br /> 4.13-3 Noise—Increased Traffic Noise After construction SJCCDD,in <br /> The project applicants shall:implement the measures conjunction with the <br /> identifiedbelow. developer <br /> < Before occupancy of the fr*reside=at <br /> College Pur,a noise barrier shall.be constructed <br /> by the College Park developers between the five <br /> :existing residences located on the north side of <br /> Chit Line Road between Central-Parkway and <br /> .the Alameda County line(Receptor 14 in;Figure <br /> 4.13-2 of the W and the wrtbem travel lane of <br /> Grant Lute R md.The.noise barriers may consist <br /> ofa..:wall;bens,�econ�bi�ration thoreo£The <br /> exert location, K and character of the,noise <br /> barcitar gall be dedby a noise consultant <br /> ap lrsd by tile. T sound bari�r shall <br /> redue�o dour noise levels,*dw center of the <br /> front yam of the five a residences to <br /> below 65 8A UMICNEL:1W Gran Lire.Road is <br /> wiOmd at this to. . <br /> construpUoq,of the sound barrier but before <br /> raxml,of the.five residences upder Specific <br /> P}an IIS tba-sound barder4ball be relocated,as <br /> re4unod:if#hieSvc existing residences are <br /> removed under Specific Plan U before occupancy <br /> of the first residence under the College Park <br /> project,this mitigation measure shall not require <br /> M imptementation.This mitigation shall be funded <br /> tbrough-fair-share payments by the College Park <br /> developers. <br />