Laserfiche WebLink
� © <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&Verification <br /> M%abon Measure TiminglScttedule Date <br /> Responsibility Action Completed <br /> 4.13-4 Noise—Compntibility of)PrQposed Land Uses After construction SJCCDD,in <br /> exceeding,Fredicted Noise Lgvels conjunction with the <br /> The College Bark developers shall.implement the developer,in <br /> following measuures: consultation with a <br /> < Trask Noise—Arterials.Before occupancy of qualified acoustical <br /> the fust residence proposed wader the College consultant <br /> Park deck along each of the seven arterial <br /> segmew identified in Table 4.13-11 of the EUI, <br /> a sound barrier shall be constructed by the <br /> College Park developers along that arterial <br /> segment.The noise barrier may consist of a wall, <br /> berm,or combination thereoL The exact location, <br /> height and character of the sound barrier shall be <br /> determined by a noise consultant approved.by the <br /> County.The sound barrier shall reduce outdoor <br /> noise levels at the center of backyards of <br /> proposed adjacent single-family residences to <br /> below 65 dBA Ld,/CNEL and as close.to 60 dBA <br /> ca Ld/CNEL as feasible.This mitigation shall be <br /> fundod through fair-share payments by the <br /> College Park developers. <br /> c <br /> 3' <br />