Laserfiche WebLink
(e.g.,compatible siting of land uses, inclusion of residential support services, <br /> coordination of land uses with transportation). The project is consistent with <br /> General Plan policies since: 1)the infrastructure planned would meet the <br /> requirements and standards of the County and the Mountain House Community <br /> Services District(MHCSD); 2) all necessary on-site and off-site easements and <br /> dedications for the maintenance of the water, sewer,and storm systems shown on <br /> the proposed Tentative Map would be provided; 3)the waste management <br /> requirements of the County and the MHCSD would be met; 4)energy resources <br /> would be conserved and air pollution minimized by means of participation in adopted <br /> plans(e.g.,TDM Plan); and 5)transportation improvements adequate to serve the <br /> proposed project would be constructed. <br /> With respect to the Master Plan/Specific Plan III,the consistency review found that <br /> the proposed subdivision addresses the affordable housing objectives expressed in <br /> these plans by meeting Master Plan/Specific Plan III requirements for housing <br /> diversity and affordability. To meet Master Plan/Specific Plan III requirements <br /> regarding noise,future residents of the subdivision would be protected from <br /> excessive outdoor and indoor noise levels via landscaping,wall treatments,and <br /> construction requirements for homes.To promote greater energy efficiency and <br /> accessibility in accordance with MasterPlan requirements,development of the <br /> subdivision would incorporate a number of design features. <br /> With respect to the Public Financing Plan;the consistency review has determined the <br /> proposed subdivision is consistent with said plan because: 1)development of the <br /> subdivision would finance the pro-rata cost of infrastructure needed to serve it, <br /> through a combination of impact fees, monthly utility charges, special taxes and <br /> MHCSD special taxes; and 2)development of the subdivision would pay the cost of <br /> mitigating impacts on existing facilities,infrastructure and the environment. <br /> Finally,the consistency review has determined that the conditions of approval for the <br /> subdivision along with the applicable Mitigation Measures from the Specific Plan III <br /> EIR would also help assure consistency with all applicable adopted plans. <br /> 2. The design or improvements of the proposed subdivision is consistent with the General <br /> Plan,the Master Plan, Specific Plan III, and any applicable Special Purpose Plan. <br /> This finding can be made since the analysis conducted by the Community <br /> Development Department has found that the design or improvements of the <br /> proposed subdivision,as shown on the Tentative Map, is consistent with the <br /> (amended)General Plan,Master Plan,and Specific Plan III,and the proposed Special <br /> Purpose Plan. The design of the proposed subdivision would facilitate the <br /> development of a variety of housing opportunities for future residents, including <br /> housing for residents at various income levels(as evidenced by the number of small <br /> lot and small home products and second unit dwelling options). It would help enable <br /> residential density requirements of adopted plans to be met. It would allow for the <br /> incorporation of a coordinated system of auto, pedestrian,and bicycle facilities that <br /> provide efficient access within the project and to commercial and public <br /> destinations. it would help create a distinctive and livable residential environment <br /> within the project. Concerning design, all landscape, hardscape and street elements <br /> within the proposed subdivision would be designed and constructed in accordance <br /> with the adopted community approvals regarding specific themes and material <br /> variation. <br /> The design and improvements of the proposed subdivisions have also been found to <br /> 29 <br />