Laserfiche WebLink
GEOLOGY AND SOILS <br /> 22. Seismic Safety: The applicant shall comply with the applicable provisions of the MHCSD <br /> Emergency Preparedness Plan. <br /> Timing: Inclusion of a note on Improvement Plans approved by CDD and MHCSD prior to <br /> approval of Final Maps. <br /> 23. Geotechnical Investigation Recommendations: The applicant shall follow the <br /> recommendations of the Geotechnical Engineering Report:Mountain House Teixeira Souza <br /> Property prepared by Wallace Kuhl &Associates, Inc., dated May 28, 2004. (Note: Said <br /> recommendations have been confirmed by letter to CGKL Kamilos Development, Inc. dated <br /> July 6, 2006 and revised October 27, 2006.) <br /> Timing: Inclusion of a note on Improvement Plans approved by CDD and MHCSD prior to <br /> approval of Final Maps, and the incorporation of all recommendations of the geotechnical <br /> engineering studies into site preparation and construction of each dwelling prior to approval <br /> of building permits. [San Joaquin County Development Title, Chapter 9-905] <br /> HAZARDS ! <br /> 24. Hazardous Materials: The applicant shall follow the recommendations of the Phase i <br /> Environmental Site Assessment Update Mountain House Teixeira-Souza Property Villages <br /> D2, D3, and D4, prepared by Wallace Kuhl &Associates, Inc., dated October 27, 2006. <br /> Timing: Inclusion of a note on Improvement Plans approved by CDD, Environmental Health <br /> Department, and MHCSD prior to approval of Final Maps. <br /> 25. Hazardous Waste: Handling, use and storage of hazardous chemicals or materials <br /> including, but not limited to, asbestos shall be carried out in compliance with all applicable <br /> safety standards and coordinated County programs. Applicable standards shall be made part <br /> of the construction specifications for contractors. <br /> Timing: Inclusion of note on Improvement Plans approved by San Joaquin Valley Unified Air <br /> Pollution Control District and MHCSD prior to approval of Final Maps. <br /> 26. Pre-Construction Safeguards. Prior to any construction, appropriate plans, operating <br /> procedures and safeguards shall be undertaken to insure safety in the area of fuel lines and <br /> pipelines, consistent with the MHCSD Emergency Preparedness Plan (see Emergency <br /> Pipelines Safety Plan). <br /> BIOLOGICAL RESOURCES <br /> 27. Participation in HCP: The College Park developers shall request coverage under the San <br /> Joaquin Multi-Species Habitat Conservation and Open Space Plan ("SJMSCP"). <br /> 28. Special-status plants: Before ground disturbance, pre-construction surveys for special-status <br /> plants shall be conducted by a qualified botanist in areas identified as suitable habitat by <br /> SJCOG at the appropriate time of year when the target species would be in flower or otherwise <br /> clearly identifiable. Surveys shall be conducted in accordance with specific methodologies <br /> described in Section 5.2.2.5 of the SJMSCP. <br /> If special-status plants are found, the following measures shall be implemented, depending <br /> on the species found: <br /> Sanford's arrowhead Delta button-ceIM, and slough thistle. The SJMSCP requires <br /> complete avoidance for these species; therefore, potential impacts on these species could <br /> not be covered through participation in the plan. If these species are present in the project <br /> area and cannot be avoided, a separate consultation with the appropriate regulatory agencies <br /> 6 <br />