Laserfiche WebLink
to being recorded by the County Surveyor's Office. <br /> VI. LAMMERSVILLE ELEMENTARY SCHOOL DISTRICT (Staff Contact <br /> Doris Unsod, 209-836-7400) <br /> 1. The developer shall enter into full mitigation agreement with the Lammersville Elementary <br /> School District (LESD). [Master Plan Implementation 5.1.3 (j).] <br /> Timing: Condition shall be met prior to approval of the first Final Map. <br /> 2. The school funding agreements between the applicant and Lammersville Elementary School <br /> District and Tracy Unified School District shall be implemented to provide interim and <br /> permanent funding for school facilities, as evidenced by certificates of compliance from these <br /> entities stating that the developer has complied with funding requirements as per the <br /> agreements. [SPIII Implementation Measure 5.2.3 (o).] <br /> Timing: Condition shall be met prior to approval of Final Maps. <br /> Vu. TRACY UNIFIED SCHOOL DISTRICT (Staff Contact Denise Wakefield, <br /> 209-830-3245) <br /> 1. The developer shall enter into full mitigation agreement with the Tracy Unified School District <br /> (TUSD). [Master Plan Implementation 5.1.3 (j).] <br /> Timing: Condition shall be met prior to approval of the first Final Map. <br /> 2. The school funding agreements between the applicant and LESD and TUSD shall be <br /> implemented to provide interim and permanent funding for school facilities, as evidenced by <br /> certificates of compliance from these entities stating that the developer has complied with <br /> funding requirements as per the agreements. . [SPIII Implementation Measure 5.2.3 (o)] <br /> Timing: Condition shall be met prior to approval of Final Maps. <br /> VIII. SAN JOAQUIN COUNCIL OF GOVERNMENTS (Staff Contact Erin <br /> Sickler, 209-468-3913) <br /> 1. This project is subject to the San Joaquin Multi-Species Habitat Conservation and Open <br /> Space Plan (SJMSCP). As such, the developer shall complete the following steps to satisfy <br /> SJMSCP requirements: <br /> a) Schedule a SJMSCP Biologist to perform a pre-construction survey Prior to any ground <br /> disturbance. <br /> b) Sign and return to SJMSCP staff of SJCOG the Incidental Take Minimization Measures <br /> (given to the developer by SJMSCP staff after the pre-construction has been completed). <br /> c) Pay to SJCOG the SJMSCP fee based on SJMSCP findings. [Note: The fee was paid May <br /> 31, 2006 as part of Specific Plan III fee payments to SJCOG.] <br /> 28 <br />