Laserfiche WebLink
` College Park at Mountain House Spedlic Plan III <br /> Mitigation Monitoring and Reporting Program <br /> at implementation lmplementadon&Verification <br /> Mffipdon Measure TiminglSehedule Date <br /> Responsibility q�n <br /> Completed <br /> 4,2 LAND USE <br /> 4.2-1 Laud.Use.and Agriculture•—Coa ict with Existing Before and during San Joaquin County <br /> Laud,Urea construction,and <br /> Community <br /> The College Park developers shall implement the During design phase Development <br /> following measures: Dqwtmcmt .. <br /> < Fence off the two-on-site,Byron-Bethan.y (SJCMI)),in <br /> Irrigation DiaErict(BB1I)canals from roposed conjunction with the <br /> urban development untd such time as the canals developer,and in <br /> are Shed.The feDhog,shall be sufficient to block coordination with <br /> access to the canals by'all'except BBID BBID <br /> personnel atm odwtutbonzed per,and shall <br /> be developed in coordination with BBID to <br /> ensue that BBID has 6ontinued access to the <br /> canals for maintenance activities. <br /> < Implement Mitigation Measure 4:9-5,identified <br /> in Section 4.9;`Public Health and Safety,"to <br /> ensure that the proposed residences are not <br /> exposed to an explosion hazard from the natural <br /> gas pipelines within the PG&E-Chevron <br /> easement that bisects the prpject site. <br /> < Idaatifyan agricultural buffer of no less than 104 <br /> feet at,the time of Tentative Map ap wval.for <br /> any new units in the residential area in and south <br /> of Grant bine Village and adjacent to the County <br /> lirm <br /> � o <br />