Laserfiche WebLink
3: rn <br /> ` . 9College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&Verification <br /> Mitigation Measure rminglSdedule Responsibility Action Date <br /> Completed <br /> 4.2-4 Land Use and Agriculture—Conflict Substantially After discontinuance SJCCDD,in <br /> with Existing Agricultural Zoning or Williamson of interim land conjunction with the <br /> Act Contracts disposal. developer <br /> The proles applicants-shall implement the following <br /> mitigation measure: <br /> < At such time as the interim land disposal of <br /> 0�5 treated wastewater at the Pombo property is <br /> discontinued,GNK,LLC shall remove the 30- <br /> acre storage pond and restore the storage pond <br /> site to agricultural use(i.e.,feed crops). <br /> 4.2-5 Land Use and Agriculture--Conflicts with Before construction SJCCDD,in <br /> Adjacent Agricultural Operations conjunction with the <br /> < Before development,the project developers shall developer,and in <br /> provide for the continued provision of irrigation coordination with <br /> water to downstream agriculture reliant on the BBID <br /> water from the canals by the installation of <br /> pipelines and"other means:The filling of the <br /> irrigation canals shall be approved by BBID. <br /> 4.6 CULTURAL RESOURCES <br /> 4.6-2 Cultural Resources—Pgtenti4l During construction SJCCDD,in <br /> Destrnction/Damage to Undiscovered.Cultured conjunction with the <br /> Resources developer,and in <br /> If discovery of unknown cultural materials,is made conjunction with <br /> during construction,ground-disturbing activities at qualified <br /> the aonoru llon site where the discovery was made archaeologist,if . <br /> shall be halted.The College Park developers or neede& <br /> construction contractor shall contact the San Joaquin <br /> County Community Development Department <br /> (SJCCDD)immediately,and a qualified professional <br /> archaeologist acceptable to County staff shall be <br /> notified and relsined by the College Park developer. <br /> The archaeologist shall determine whether the <br /> resource represents a`unique archaeological <br />