Laserfiche WebLink
Coltiege Park at Mountain House Speci$c Pian III <br /> 'n Mitigation Monitoring and Reporting Program <br /> � Impletnenlion&Verification <br /> Mitigation Measure Timing/Schedule I bit Action Completed <br /> Bled <br /> P <br /> employing one of several methods outlined m <br /> Section 5.2.4.15 of the SJMSCP.These include <br /> rete dca of tall vegetation,regular during of the <br /> site,or use of chemicals or traps to 10 ground <br /> etlui�ls; - <br /> ► Pre-construction snveys for burrowing owls <br /> shall be conducted where project construction <br /> activities would occur within 75 meters of <br /> �. suitable habitat(based on SJCOG r1evww).The <br /> survey shall be conducted within 2 weeks of the <br /> beginning of construction.If burrowing owls are <br /> found,the following measures shall be <br /> y <br /> iniplemmxted <br /> • Daring the noubreediug season(September 1 <br /> through January 31),burrowing owls <br /> orcuupying.the project.site.shallbe evicted <br /> from the project site by passive relocation,as <br /> dwabed in dw DFG's Stq f'Report on <br /> Burrowing Owls(DFG-1995). <br /> $ During the'breeding season(February 1 <br /> A 31 occupied burrows shall <br /> tbz'ough �t )� <br /> not be dist fiW and shall be provided with a <br /> 250-foot protective buffer until and unless . <br /> the Technical AdvvWy i*e,with the <br /> concurrence of the permi"agelides' <br /> repmaentatives on the Technical Advisory <br /> Committee,or a qualified biologist approved <br /> $ by the permitting agencies,verifies through <br /> noninvasive means that either(1)the birds <br /> have not begun egg laying or(2)juveniles <br /> M from the occupied burrows are foraging <br /> independently and are capable of <br /> independent survival.After the fledglings <br />