Laserfiche WebLink
M <br /> • v <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&Verification <br /> Mitigation Measure .Timing/Schedule Responsibility qcfion Date <br /> Completed <br /> are capable of independent survival,the <br /> burrow can be destroyed. <br /> 4.10-6 Biological Resow c —Conversion of Common Before and during SJCOG,in <br /> Nesting Raptor Habitat sad PossibleLoss of construction consultation with DFG <br /> -p Active Nests <br /> < The College Park developers shall tegoest <br /> coverage under the SJMSCP,and fees shall be <br /> paid in the amount determined by SJCOG during <br /> the application and review process for each <br /> project under College Park.Potential nest sites <br /> for all tree-nesting species are scattered <br /> throughout much of the College Park site,but are <br /> O° concentrated along Grant Line Road and at Grant <br /> Line Village.Suitable nesting habitat for <br /> northern harrier is provided by ail field crops and . <br /> fallow gelds.During the SJMSCP application <br /> process,SJCOG will determine whether that . <br /> specific prosect site supports suitable nesting <br /> habitat.If SJCOG determines suitable habitat is <br /> present on or 4acent to a given project site,the <br /> S,IMSCP incidental take avoidance and <br /> minimization measures described below for <br /> nesting raptors shall be implemented.Additional <br /> measures below,shall be implemented to avoid <br /> loss of active nest of common raptor species, <br /> which are not covered under the SJMSCP but are <br /> protected under the California Fish and Game <br /> Code.The project applicants shall retain <br /> qualified biologists to conduct all pre- <br /> construction surveys. <br /> < WWte-tailed Kite.If project construction begins <br /> _ during the nesting season(February 15– <br /> September 15),pre-construction surveys shall be <br />