Laserfiche WebLink
College Park at Mountain Sonw..Specific Plan III <br /> Mitiigadon Monitoring and Reporting Program <br /> � Implementation&Verification <br /> Ot Mitigation Measure Timing/Schedule Implementation Date <br /> Responsibility. Action <br /> Completed <br /> conducted to investigate all potential nesting <br /> U=on the project site(e.g.,especially tree-tops <br /> 15-59 feet above the ground in oalc,willow, <br /> eucalyptus,cotlanwpod,or other deciduous <br /> trees),whenever white-tamed kites are.noted on- <br /> site or within ft viicinity of thf site during the <br /> nesting season.A setback of 100 feet from white- <br /> tailed kite nest areas shall be establisbed and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> cont mmo tint hledglings leave nests.This <br /> setback applies whenever ccoustruction or other <br /> J groui�-dista�hrbing actrvilles m11$t OGg�n d� <br /> the Nesting mom in the presence of nests that <br /> are known to be occupied.Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> < Northern Harder.If-project construction begins <br /> during the nesting seam(February 15—August <br /> 31),pre-constnrc�ion surveys shall be conducted <br /> dining the nesting season in suitable nesting <br /> habitat within 500 feet of areas of project <br /> activity.17he survey shall be conducted within <br /> she 2 weeks before mon begins.A <br /> setbaCk of Soo feet from northem harrier nesting <br /> areas shall be estabW%ed and mainained during <br /> the nesting season for the period encompassing <br /> nest building and continuing until fledglings <br /> leave nests.This setback applies whenever <br /> construction or other ground-disturbing activities <br /> d must begin during the nesting season in the <br /> M presence of nests that are known to be occupied. <br /> v Setbacks shall be marked by brightly colored <br /> temporary fencing. . <br /> < Common Raptors.if project construction begins <br />