26. Wastewater Treatment Plant: <br /> A. Under the direction of the MHCSD,,the applicant-shall fund, design and construct a <br /> phased. expansion of the wastewater treatment plant'(WWTP)of sufficient capacify, no <br /> less than 1.5 mgd,36 serve Tract No.-3646 prie r to'issuarice-of the first building'permii. <br /> Recognizing that there may be agreements between the developers°for slanng.capacity <br /> and also.recognizing.that the MHCSD is not a,party'to and tial no:control over,such <br /> agreements, bonding for construction shall be providedprier to approval of,the first final <br /> map and-beginning of construction shall beat the discretion"of the'General Manager. - <br /> I Issuance of buildingermits <br /> p shall,cease if construction does•not begin when directed by <br /> the General Manager. .. }. x <br /> B. The developer shall extend existing pipelines to the'project site as-shown on`the Master <br /> Sanitary Sewer Plan. The developer shall also extend the sanitary sewer system _„ <br /> pipelines.to the Grant Line Village frontage road as directed by the General Manager in <br /> order to serve the residents of Grant Line Village. Interim treated wastewater land <br /> disposal capacity and piping system to-serve the proposed project=shall be provided by <br /> the developer until-such time as the river,discharges commence.'`Initiation of-'State' <br /> Permit Application for land application of the treated discharge requirement shall parallel <br /> the treatment plant capacity condition noted above, as directed by the General Manager. <br /> C. The Wastewater Treatment Plant expansion requirement in Condition 26.A sh <br /> q all meet <br /> the requirements of the Regional Water Quality.Control Board (RWQCB)effluent <br /> permits, including compliance scheduling, testing and any infrastructure that may be <br /> required for long-term discharge into Old River. Additional treatments that may be <br /> required by the RWQCB for such pollutants as dissolved solids, metals and heat, <br /> etc., shall be addressed in the plant expansion. The developer shall bond for or fund <br /> construction for the developer's fair share cost prior to the filing of the first Final Map. <br /> 27. Water Treatment Plant: Under the direction of the MHCSD, the applicant shall fund, design <br /> and construct the last <br /> phased expansion of the water treatment plant{ TP}to provide the <br /> capacity required to serve Tract No.3646 prior to Issuance of the first building permit. <br /> Recognizing that there may be agreements between the developers for sharing capacity and <br /> also recognizing that the MHCSD is not a party to and has no control over such agreements, <br /> bonding for construction shall be provided prior to approval of the first final map and <br /> beginning of construction shall be at the discretion of the General Manager. Issuance of <br /> building permits shall cease if construction does not begin when directed by the General <br /> Manager, <br /> 28. Other Water System Facilities:Water storage requirements, booster pump station and <br /> looping of the water distribution system pipelines shall be done in accordance with the Water <br /> Master Plan and as directed by the MHCSD prior to issuance of the first building permit in <br /> SP III. Construction of one tank may be allowed if an engineering analysis shows that the <br /> second tank may be constructed at a later date without adverse impact on the first tank <br /> and/or existing customers of MHCSD. Each phase of SPIII will be reviewed to confirm the <br /> existing"in-place" infrastructure is adequate to provide MHCSD Design Standards. <br /> 29. Construction Emissions: The applicant shall implement the following: Regulation VIII <br /> Control Measures of the SJVAPCD and applicable measures in Table 6-3 of the SJVAPCD <br /> Guide for Assessing and Mitigating Air Quality Impacts. Timing: Note on improvement <br /> plans approved by the MHCSD for Tract 3646. <br /> 30, BBID Canal: The applicant shall reroute the canals as directed by BBID in order to ensure <br /> continued supply of agricultural irrigation water to lands remaining in agricultural use <br /> fallowing construction. Timing: Approval of the rerouting and grading and improvement <br /> plans approved by MHCSD prior to approval of first f=inal Map. <br /> 24 <br /> f <br /> { <br />