Laserfiche WebLink
cn n <br /> v o <br /> rn College Park at Mountain House Specific Plan III <br /> c Mitigation Monitoring and Reporting Program <br /> Im iementation&Verification <br /> Mitigation Measure Timing/Schedule Implementation p <br /> a Responsibility Action Date <br /> -� Completed <br /> retention in-lieu of the required expansion of WQB 1, <br /> = before development of those portions of <br /> c Neighborhoods B and D to be served by the DeAnza <br /> Boulevard and Mountain House Parkway storm-drain <br /> systems. <br /> 4,8 WATER QUALITY <br /> '0 4.8-1 Water Quality--Potential Temporary NOI(s)submitted to MHCSD, in <br /> Construction-Related Water Quality Effects the Central Valley conjunction with the <br /> The College Park developers shall consult with the RWQCB before developer,and in <br /> Central Valley Regional Water Quality Control Board beginning of coordination with the <br /> (RWQCB)to acquire the appropriate regulatory applicable ground- Central Valley <br /> approvals that may be necessary to obtain Section disturbing or RWQCB <br /> 401 water quality certification, ensure compliance dewatering activities; <br /> with the State Water Resources Control Board water quality <br /> (SWRCB)statewide National Pollutant Discharge performance <br /> Elimination System(NPDES)stormwater permit for standards established <br /> general construction activity and the Ceritral Valley before construction <br /> RWQCB NPDES permit for construction dewatering. begins <br /> activity,and obtain any other necessary site-specific <br /> ' WDRs or waivers issued pursuant to the Porter— <br /> Cologne Act.As required under the NPDES <br /> o stormwater permit for general construction activity, <br /> o the project applicant shall prepare a Stormwater <br /> Pollution Prevention Plan(SWPPP)and any other <br /> necessary engineering pians and specifications for <br /> Q pollutiori prevention and control,The SWPPP and <br /> CD other appropriate plans shall: <br /> < Identify and specify the use of erosion and <br /> sediment control Best Management Practices <br /> -� (BMPs), means of waste disposal, <br /> nimplementation of approved local plans,non- <br /> stormwater management controls,permanent �. <br /> postconstmction BMPs, and inspection and <br />