Laserfiche WebLink
M M <br /> �. a <br /> A-' College Park at Mountain'House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Imple <br /> 6 Mitigation Measure <br /> Tim . . <br /> mentation.&Verification <br /> Responsib7ity Action Date <br /> Completed <br /> a maintenance responsibilities; <br /> < Specify the pollutants that are likely to be used <br /> during construction that could be present in <br /> ? stormwater drainage and non-stormwater <br /> discharges; <br /> o < Specify BMP inspection protocols to ensure that <br /> the BMPs are effective and ensure that the <br /> 3 monitoring is conducted if nonvisible pollutants <br /> are inadvertently discharged into stormwater, <br /> < Identify construction techniques that will reduce <br /> the potential for runoff; <br /> < Identify the erosion and sedimentation control <br /> 00 measures to be implemented; <br /> < Specify spill prevention and contingency <br /> measures; <br /> < Identify the types of materials used for <br /> a equipment operation; <br /> < Identify measures to prevent or clean up spills of <br /> hazardous materials used for equipment <br /> b <br /> m operation and hazardous waste; <br /> v < Identify emergency procedures for responding to <br /> spills; <br /> < Identify BMPs that shall be used in all <br /> a subsequent site-development activities; <br /> z <br /> < Identify personnel training requirements and <br /> cn procedures that will be used to ensure that <br /> m workers are aware of permit requirements and <br /> proper installation and performance inspection. <br /> methods for specified BMPs; <br /> < Identify the appropriate personnel responsible for <br /> o supervisory duties related to implementation of <br /> the SWPPP; and <br /> `� < Require all construction contractors to retain a <br />