Laserfiche WebLink
M <br /> a <br /> �. College Park at Mountain House Specific-Plan III <br /> o <br /> Mitigation Monitoring and.Reporting Program <br /> Implementation Implementation&Verification <br /> Mitigation Measure Timing/Schedule ResponsibilityQate. <br /> Action <br /> a, Completed <br /> a during the nesting season(February 15 August <br /> ro 31),pre-construction surveys shall be conducted <br /> during the nesting season in suitable nesting <br /> habitat within 500 feet of areas of project <br /> activity. The survey shall be conducted within <br /> 'D the 2 weeks before construction or tree removal <br /> 0 <br /> begins. If any active nests are found,a setback of <br /> 3 200 feet from each nest shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests.This <br /> setback applies whenever construction or other <br /> o ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> 4.10-7 Biological Resources—Conversion of Other Before construction SJCOG,in <br /> Special-Status Nesting Bird Habitat and Possible (surveys shall be consultation with DFG <br /> Loss of Active Nests conducted 2 weeks <br /> The College Park developers shall request coverage prior to,construction <br /> „ under the SJMSCP,and fees shall be paid in the activities) <br /> amount determined by SJCOG during the application <br /> and review process for each project under College <br /> Park.During the SJMSCP application process, <br /> SJCOG will determine whether that specific project <br /> n site supports suitable habitat for loggerhead shrike, <br /> (DCalifornia horned lark,or tricolored blackbird.If <br /> o SJCOG determines suitable habitat is present on or <br /> a CD adjacent to a given project site,the following <br /> n SJMSCP incidental take avoidance and minimization <br /> 7o measures shall be implemented by the project <br /> applicants in consultation with a qualified biologist. <br /> -� - < Loggerhead Shrike,if projectconstruction <br />