Laserfiche WebLink
cn c� <br /> ns o <br /> College Park at Mountain House Specific Plan M <br /> Mitigation Monitoring and Reporting Progtatn <br /> n T, implementation,&V601cation' <br /> c Implementation <br /> Mitigation Measure TiminglSchedWe <br /> c Pate <br /> Responsibility Action Completed <br /> �• begins during the nesting season(April I--August <br /> 31),pre-construction surveys shall be conducted <br /> during the nesting season in suitable nesting <br /> habitat within 100 feet of areas of project <br /> CO <br /> activity. The survey shall be conducted within <br /> n the 2 weeks before construction or tree removal <br /> begins.A setback of 100 feet from loggerhead <br /> shrike nesting areas shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests.This <br /> setback applies whenever construction or other <br /> N <br /> ground-disturbing activities must begin during <br /> y the nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> < California Horned Lark and Tricolored <br /> Blackbird.If project construction be&s.during <br /> the nesting season(April 1-August 31),pre- <br /> �' construction surveys shall be conducted during <br /> the nesting season in suitable nesting habitat <br /> o within 500 feet of areas of project activity, A <br /> setback of 500 feet from California homed lark <br /> �. and tricolored blackbird nesting areas shall be <br /> established and maintained during the nesting <br /> aseason for the period encompassing nest building <br /> ;o and continuing until fledglings leave nests.This <br /> osetback applies whenever construction or other <br /> ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> Z3 m are known to be occupied. Setbacks shall be <br /> o marked by brightly colored temporary fencing. <br /> sv � <br /> 3 4.10-9 Biological Resources—Conversion of San Joaquin I .Before construction I SJCOG,in <br />