Laserfiche WebLink
M <br /> r.: Q <br /> Z, College Park at Mountain House Specific Plan M- <br /> Mitigation Monitoring and Reporting Program <br /> o Implementation&Verification <br /> Implementation <br /> o, Mitigation Measure Timing/Schedule Responsibility Action Date <br /> cn Completed <br /> biologist and DFG determine it would not be <br /> CL <br /> ::0 likely to adversely affect the nesting pair.DFG <br /> CD shall also be consulted to determine if it is <br /> necessary to temporarily preserve foraging <br /> habitat(in addition to the buffer area)until the <br /> nest is no longer active. <br /> < If feasible,250-foot buffer areas shall also be <br /> established around all other occupied burrows.If <br /> this is not feasible,DFG shall be consulted to <br /> determine whether smaller buffer areas and/or <br /> relocation of owls is necessary, Relocation may <br /> include passive techniques,such as use of one- <br /> way doors to encourage owls to move to <br /> co <br /> alternative burrows outside the impact area, or <br /> capture and movement of owls to specific <br /> mitigation sites. <br /> 0 Other Nesting Raptors Before construction SJCOG,in <br /> �c < If project construction begins during the raptor (surveys shall be consultation with DFG <br /> CD nesting season(February.15 to August 31),pre- conducted 2 weeks <br /> .D <br /> construction surveys shall be conducted by a prior to construction <br /> qualified biologist in areas of suitable-nesting, activities) <br /> habitat within 500 feet of project activity.Surveys <br /> shall be conducted within 2 weeks before the <br /> U beginning of construction or tree removal.If no <br /> active nests are found,no further mitigation shall <br /> be required. <br /> < If active nests are found,impacts shall be avoided <br /> o` cn by establishment of appropriate buffers.No <br /> project activity shall commence within the buffer' <br /> area until a qualified biologist'confirms that the <br /> nest is no longer active.DFG guidelines <br /> recommend implementation of 500-foot buffers; <br /> but the size of the buffer may be adjusted if a <br /> _ f <br />