Laserfiche WebLink
� n <br /> m o <br /> `CD College Park at Mountain House Specific Plan III <br /> v MItigation Monitoring and Reporting Program <br /> Mitigation Measure Timing/Schedule <br /> Implementafion _ Implementation&Verification <br /> Responsibility Action Date <br /> Completed <br /> qualified biologist and DFG determine it would <br /> not be likely to adversely affect the nest. <br /> Monitoring of the nest by a qualified biologist <br /> CA <br /> CD may be required if the activity has potential <br /> 73 adversely affect the nest. <br /> a San Joaquin Kit Fog Before construction S'COG, in <br /> n <br /> v < To minimize the potential for destruction of an (surveys to be consultation with <br /> occupied burrow and direct take of a kit fox,a cornpleted no more USFWS and DFG <br /> pre-construction survey for active.and potential kit than 30 days and no. <br /> fox dens shall be conducted by a qualified less than 14 days <br /> biologist no more than 30 days and no less than 14 before construction <br /> days before the beginning of ground disturbance activities) <br /> or construction activity.The survey shall include <br /> all undeveloped areas in and within 100 feet of <br /> development and staging areas.Potential dens <br /> shall be monitored to determine if they are active, <br /> in accordance with methods presented in the <br /> K Standardized Recommendations for Protection of <br /> the San Joaquin Kit Fox Before or During Groun <br /> a' Disturbance(USFWS 1999). <br /> < If no active dens are found during the surveys,a <br /> o letter report documenting the survey methodology <br /> j' and findings shall be submitted to USFWS and <br /> DFG within 5 days after survey completion and <br /> m before the start of ground disturbance or <br /> a construction activity,and no further mitigation <br /> shall be necessary. <br /> 0 < Any known or potential dens discovered within <br /> the survey area shall be monitored for 3 days to <br /> determine its current use. If no activity is observe <br /> a o during this period, the den shall be destroyed <br /> S > immediately to preclude subsequent use. If kit fox <br /> activity is observed, the den shall be monitored fo <br />