Laserfiche WebLink
cn n <br /> 4+ o <br /> CD College Park at Mountain Hoitse Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> © °'- Implementation Implementation.&�Verifcation . <br /> c Mitigation Measure Timing/Schedule <br /> ResponsibilityAction Date <br /> Corn feted <br /> With-Project Conditions on Anticipated Network <br /> o For consistency with previously adopted roadway <br /> standards,the County shall extend the standard of <br /> CD LOS D to the segment of Byron Road east.of Grant <br /> Line Road. <br /> Because Byron Road is a major regional arterial <br /> serving the area,the County shall extend <br /> implementation of Mountain House Master Plan <br /> (MHMP) EIR mitigation measure 4.12-5(e)to apply to <br /> Byron Road east of Grant Line Road. <br /> 4.12. AIR QUALITY <br /> 4.12.1 Air Quality—Generation of Temporary,Short- Before construction SIVA <br /> PCD, in <br /> ` Term Construction Emissions of Criteria Air begins and during conjunction with the <br /> Pollutants construction developer <br /> The College Park developers shall implement the latest <br /> version of the SJVAPCD construction-emissions <br /> control measures during construction(see"Regulatory <br /> Setting,"above). <br /> v The latest version of the San Joaquin Valley Air <br /> Pollution Control District(SJVAPCD)control <br /> measures are included in the Guide for.4ssessing and <br /> Uidgating f it Quality Impacts(SJVAPCD 199$)and <br /> o repeated in the"Regulatory Setting"subsection.The <br /> SIVAPCD periodically revises its control measures. <br /> Development under College Park would be required by <br /> the SJVAPCD to implement the current version of the <br /> m measures at the time individual development <br /> applications are received by the County for <br /> development under College Park. <br /> -0 4.12-2 Air Quality--Potential Generation of Toxic Air Before construction SJVAPCD,in <br /> M Contaminants(IACs) begins and during conjunction with the <br /> Asbestos—The College Park developers shall construction developer <br /> implement Mitigation Measure 4.9-I. <br />