Laserfiche WebLink
M m <br /> College Park at Mountain House Specific Plan IIf <br /> Mitigation Monitoring and Reporting Program <br /> Implementation&VeM6ation <br /> o' Mitigation Measure Timing/Schedule ImplementationP Date <br /> Responsibility Action <br /> Completed <br /> ► Mobile-Source TAC Emissions--The College <br /> Park applicants for industrial or commercial land <br /> m uses shall coordinate with the SJVAPCD to <br /> assess situations in which toxic risk from diesel <br /> cQ particulate matter(PM)may occur and to review <br /> - methodologies that may become available to <br /> 43 <br /> estimate the risk. The developers shall implement <br /> any project-level measures adopted by the <br /> S.VAPCD to reduce mobile-source TACs <br /> emissions. <br /> 4.12-3 Air Quality—Possible Temporary and Occasional Before and during SICCDD, in <br /> Exposure of New Sensitive Uses to Odors construction conjunction with the <br /> The College Park developers shall not develop any developer <br /> new residential uses within 1,004 feet of the two <br /> existing on-site dairies until such time as the diaries <br /> cease operation and the dairy waste ponds and animal <br /> o refuse,piles are removed. <br /> cc 4.12.5 Air Quality---Increased Long-Term Regional Before construction SIVAPCD,in <br /> Emissions of Criteria Pollutants begins and during conjunction with the <br /> The College Park developers shall implement all of construction developer <br /> vthe mitigation measures as recommended in the <br /> Guide for Assessing and Mitigating Air Quality <br /> Impacts(STVAPCD 1998).Many of these measures <br /> are already included in the proposed project design <br /> and/or are already required by the MHMP and by <br /> mitigation in the MI-MO and Delta College EMs. <br /> � ro <br /> b � <br /> C � <br /> C7 � <br /> O p= <br /> C � <br />