Laserfiche WebLink
� rn <br /> College Park at Mountain House Specific Plan.M <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&Verification <br /> 6 Mitigation Measure Timing/Schedule ResponsibilityAction Date <br /> Completed <br /> aoperational standards shall be established to minimize <br /> c;e noise generated by loading dock activities from <br /> adversely affecting planned and existing oft-site <br /> noise-sensitive land uses.Design and operational <br /> measures may include: <br /> < Enclose outdoor noise-generating equipment <br /> @ and/or set back from the property line, <br /> < Locate buildings and structures such that they <br /> shield off-site sensitive receptors from on-site <br /> noise sources,including loading dock activity, <br /> < Enclose loading dock areas <br /> w < Limit loading dock activity,including delivery <br /> �* truck arrivals and departures,to between 7:00 <br /> a.m. and 10:00 p.m.at those loading docks with <br /> direct line of site of noise-sensitive receptors <br /> n within a distance of 1,000 feet.Activity at all <br /> other loading docks shall be limited to the hours <br /> ra between 5:00 a,m. and 10:00 p.m. <br /> CD Noise studies,including on-site sound level <br /> measurements, shall be conducted to ensure that these <br /> w thresholds are not exceeded.The noise studies shall <br /> o be funded by the College Park developers and <br /> C approved by SJCCDD before construction. <br /> m Landscape Maintenance <br /> The following measures shall apply to noise- <br /> generating activities associated with landscaping and <br /> C maintenance of school grounds,neighborhood parks, <br /> o community parks,and open space. <br /> < On-site landscape maintenance equipment shall <br /> 5' n be equipped with properly operating exhaust <br /> mufflers and engine shrouds,in accordance with <br /> a manufacturers'specifications.For maintenance <br /> areas located within 320 feet of noise-sensitive <br /> I MOdn <br />