Laserfiche WebLink
CO n <br /> n� o <br /> College Park at Mountain House,Specific Plan M. <br /> CMitigation Monitoring and Reporting Program <br /> Mitigation Measure Implementation Implementgon&Verification <br /> 0 9 Timing/Schedule Responsibility Date <br /> Action <br /> w Completed <br /> 4.13, NOISE <br /> 4.13-1 Noise--Generation of Temporary Construction During construction SJCCDD,in <br /> Noise conjunction with the. <br /> < Limit project construction activities to the hours developer <br /> n between 6:00 a.m.and 9:00 p.m. <br /> < Comply with the San Joaquin County <br /> -a Development Title for all construction activities, <br /> a < Equip all construction vehicles or equipment; <br /> fixed or mobile,with properly operating and <br /> maintained mufflers and acoustical shields or <br /> shrouds, in accordance with manufacturers' <br /> recommendatiobs. <br /> < Arrange all construction equipment and truck <br /> routes to minimize travel adjacent to occupied <br /> residences, <br /> < Locate stationary construction equipment and <br /> staging areas as far as possible from sensitive <br /> receptors.Temporary acoustic barriers may be <br /> ori installed around stationary equipment,if <br /> necessary. <br /> 0 4.13-2 Noise--Generation of New Stationary-Source During design phase SiCCDD,in <br /> Noise and during conjunction with the <br /> The project applicants shall incorporate the measures construction developer <br /> identified below into the project design. <br /> CL Commercial,Office,and Industrial Uses <br /> Industrial and commercial land uses proposed as part <br /> of the College Park project shall be designed to <br /> ensure that outdoor equipment does not result in an <br /> -0 exceedance of 55 dBA L�q during daytime hours <br /> rn (7:00 a.m. to 10:00 p.m.)or 50 dBA L,q during <br /> nighttime hours(10:00 p.rrL to 7:00 a.m,)at off-site <br /> noise-sensitive receptors, In addition,design and <br />