Laserfiche WebLink
F <br /> MITIGATION MONITORING AND REPORTING PROGRAM <br /> INTRODUCTION <br /> In accordance with the California Environmental Quality Act-(CEQA),San Joaquin County.(County)and <br /> Gerry N.Kamilos,LLC(GNK,LLC),prepared an.environmental ir'hpact report(EIR)that identifies <br /> adverse'impacts related to the.College Park at Mountain House Specific Plan III Project_The EIR also <br /> identifies mitigation measures thatwould reduce or eliminate these impacts. <br /> Section 21081:6 of the California Public Resources Code§15091(d)and 15097 of the State CEQA <br /> Guidelines require public agencies"to adopt a reporting and monitoring program for changes to the <br /> project which it has adopted or made a condition of project approval in order to tnitigatc'or avoid <br /> significant effects-on the environment"'A Mitigation Monitoring.and'Reporting Program(MMRP)is <br /> required for the College Park at Mountain.House Specific Plan III.Project because the EIR.for the project <br /> identified potentially significant adverse inipac(s related to construction and implementation activities, <br /> and-mitigation measures have been identified.to mitigate those impacts. <br /> F! Adoption of the MMRP will occur along with approval of the proposed project. <br /> PURPOSE OF MITIGATION MONITORING AND REPORTING PROGRAM <br /> R E This MMRP has been prepared to ensure that all required mitigation measures are implemented and <br /> completed according to schedule and maintained in a satisfactory manner during the construction of the <br /> project,as required.The MMRP may be modified by San Joaquin County during project implementation, <br /> as necessary, in response to changing conditions or other refinements.A table has been prepared to assist <br /> the responsible parties in implementing the MMRP.The table identifies individual mitigation measures, <br /> monitoring/mitigation timing,responsible person/agency for implementing the measure, monitoring and <br /> reporting procedure,and space to confirm implementation of the mitigation measures_The numbering of <br /> mitigation measures follows the numbering.sequence found in the EIR. <br /> ROLES AND RESPONSIBILITIES <br /> Unless otherwise specified herein, San Joaquin County is responsible for taking all actions necessary to <br /> implement the mitigation measures according to the specifications provided for each measure and for <br /> F11 demonstrating that the action has been successfully completed. San Joaquin County, at its discretion,may <br /> delegate implementation responsibility or portions thereof to the developer(GNK, LLC), a licensed <br /> R <br /> contractor or other designated agent. <br /> San Joaquin County will be responsible for overall administration of the MMRP and for verifying that <br /> County staff members,and/or the construction contractor has completed the necessary actions for each <br /> measure. San Joaquin County will designate a project manager to oversee the MMRP during the <br /> construction period.Duties of the project manager include the following: <br /> < Ensure that routine inspections of the construction site are conducted by appropriate San Joaquin <br /> County staff, check plans,reports, and other documents required by the MMRP; and conduct report <br /> activities. <br /> Fi < Serve as a liaison between San Joaquin County, the Mountain House Community Services Distract <br /> (MHCSD), and the construction contractor regarding mitigation monitoring issues. <br /> F t < Complete forms and maintain reports and other records and documents generated by the MMRP_ <br /> College Park at Mountain House Specific Plan lfl EDAW <br /> F, San Joaquin County 1 Mitigation Monitoring and Reporting Program <br />