Laserfiche WebLink
Coordinate and ensure that corrective actions or enforcement measures are taken;ofnccessary. <br /> The responsible party for.each item of implementation will identify the staff members responsible for <br /> coordinating with San Joaquin County on.the MIMRP. <br /> ANNUAL REPORTING <br /> San Joa uin Coun shall re S <br /> q tY P pare an annul.monitoring report until of'the project on the <br /> compliance of the activity ivith.thexequired mitigation <br /> .measures.Information regarding:periodic <br /> inspections.and other requirements shall be compiled and explained in the annual report.The report shall <br /> W designed to simply and clearly identify whether mitigation measures are being;.or have been, <br /> adequately implemented.At a r nimurti,each report shall identify the mitigation rneasures or conditions <br /> to be monitored for implementation,whether compliance with the mitigatiori'measures or conditions has <br /> occurred, the procedures.used to assess compliance,and whether further action is required. <br /> MITIGATION MONITORING AND REPORTING TABLE <br /> The annual report submitted will verify-thc implementation of mitigation measures.The MM"Table <br /> that follows should guide San Joaquin County in their evaluation and should be the basis for annual <br /> reporting. <br /> The column categories identified in-the MMRP Table are described below. <br /> Mitigation Number—This column lists the mitigation measures according to the number in the EIR. <br /> Mitigation Measure—This column provides the text of the mitigation measures identified in the EIR. <br /> Timing/Sehedule—This column lists the time frame in which the mitigation will take place. <br /> Implementation Responsibility—This column identifies the entity responsible for complying with the <br /> requirements of the mitigation measure.In most cases,the construction contractor will be responsible for <br /> conforming with the mitigation measure: <br /> Implementation and Verification—These columns are for verifying compliance.The"Action"column <br /> describes the type of action taken to verify implementation.The"Date Completed"colurnri is to be dated <br /> and'initialed by the project manager,or his/her designee,based on the documentation provided by the <br /> construction contractor,its agents(qualified individuals),or through personal versification by San Joaquin <br /> County. <br /> EDAW College Park at Mountain(louse Specific Plan III <br /> Mitigation Monitoring and Reporting Program 2 San Joaquin County <br />