My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006253 (2)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
20058
>
2600 - Land Use Program
>
PA-0600363
>
SU0006253 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 11:40:20 AM
Creation date
9/5/2019 10:46:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006253
PE
2611
FACILITY_NAME
PA-0600363
STREET_NUMBER
20058
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
APN
20907026
ENTERED_DATE
9/15/2006 12:00:00 AM
SITE_LOCATION
20058 W GRANT LINE RD
RECEIVED_DATE
9/12/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\20058\PA-0600363\SU0006253\REV SITE PLN.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1078
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M M <br /> ca' D <br /> College Park at Mountain House Specific Pian III <br /> o' <br /> Mitigation Monitoring and Reporting Program <br /> 3 Implementation Implementation&Verification <br /> Mitigation Measure 7imingl8chedule Responsibility action Date <br /> Completed <br /> 4.2-4 Land Use and Agriculture---Conflict Substantially After discontinuance SJCCDD,in <br /> with Existing Agricultural Zoning or Williamson of interim land conjunction with the <br /> CD <br /> o Act Contracts disposal developer <br /> The project applicants shall implement the following <br /> mitigation measure: <br /> c < At such time as the interim land disposal of <br /> `Q treated wastewater at the Pombo property is <br /> discontinued, GNK,LLC shall remove the 30- <br /> acre storage pond and restore the storage-pond <br /> site to agricultural use(i.e.,feed crops). <br /> 4.2-5 Land Use and Agriculture—Conflicts with Before construction SJCCDD,in <br /> Adjacent Agricultural Operations conjunction with the <br /> < Before development,the project developers shall developer,and in <br /> provide for the continued provision of irrigation coordination with <br /> water to downstream agriculture reliant on the BBID <br /> C) water from the canals by the installation of <br /> o pipelines and other means.The filling of the <br /> 12 irrigation canals shall be approved by BBID. <br /> -o 4.6 CULTURAL RESOURCES <br /> ;1L 4.6-2 Cultural Resources—Potential. During construction SJCCDD,in <br /> Destruction/Damage to Undiscovered Cultural conjunction with the <br /> c° Resources developer,and in <br /> If discovery of unknown cultural materials is made conjunction with <br /> during construction,ground-disturbing activities at qualified <br /> = the construction site where the discovery was made archaeologist,if <br /> shall be halted.The College Park developers.or needed, <br /> oCn construction contractor shall contact the San Joaquin <br /> W ro County Community Development Department <br /> C. (SJCCDD)immediately,and a qualified professional <br /> n " archaeologist acceptable to County staff shall be <br /> notified and retained by the College Park developer. <br /> The archaeologist shall determine whether the <br /> resource represents a"unique archaeological <br />
The URL can be used to link to this page
Your browser does not support the video tag.