Laserfiche WebLink
rn0 <br /> Q) 0 <br /> m College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> n Implementation <br /> Implementation&Verification <br /> Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> • 4.2 LAND USE <br /> 0 4.2-1 Land Use and Agriculture—Conflict with Existing Before and during San Joaquin County <br /> U) Land Uses construction;and Community <br /> 0 The College Park developers shall implement the During design phase Development <br /> following measures: Department <br /> < Fence off the two on-site Byron-Bethany (SJCCDD),in <br /> Irrigation District(BBID)canals from proposed conjunction with the <br /> urban development until such time as the canals developer,and in <br /> are filled.The fencing shall be sufficient to block coordination with <br /> access to the canals by all except BBID BBID <br /> personnel and other authorized persons,and shall <br /> be developed in coordination with BBID to <br /> 4' ensure that BBID has continued access to the <br /> canals for maintenance activities. <br /> < Implement Mitigation Measure 4.9-5,identified <br /> in Section 4.9,"Public Health and Safety,"to <br /> ensure that the proposed residences ate not <br /> exposed to an explosion hazard from the natural <br /> ' gas pipelines within the PG&E-Chevron <br /> ' easement that bisects the project site. <br /> =1 < Identify an agricultural buffer of no less than 100 <br /> K <br /> feet at the time of Tentative Map approval for <br /> o any new units in the residential area in and south <br /> ' of Grant Line Village and adjacent to the County <br /> m line. <br /> a. <br /> u� <br /> -n <br /> Q <br />