Laserfiche WebLink
cn 0 <br /> � o <br /> nCollege Park at Mountain House Specific Plan III <br /> CD <br /> Mitigation Monitoring-and Reporting Program <br /> c� n� Implementation <br /> Implementation&Verification <br /> Mitigation Measure <br /> Timing/Schedule Responsibility Action <br /> Date <br /> Completed <br /> employing one of several methods outlined in <br /> = Section 5.2.4.15 of the SJMSCP.These include <br /> Gretention of tall vegetation,regular discing of the <br /> site,or use of chemicals or traps to kill ground <br /> squirrels; <br /> Pre-construction surveys for burrowing owls <br /> shall be conducted where project construction <br /> v <br /> activities would occur within 75 meters of <br /> suitable habitat(based on SJCOG review).The <br /> survey shall be conducted within 2 weeks of the <br /> beginning of construction.If burrowing owls are <br /> found,the following measures shall be <br /> implemented: <br /> • During the nonbreeding season(September 1 <br /> through January 31),burrowing owls <br /> occupying the project site shall be evicted <br /> from the project site by passive relocation,as <br /> described in the DFG's Staff Report on <br /> Burrowing Owls(DFG 1995). <br /> oDuring the breeding season(February i <br /> through August 31),occupied burrows shall <br /> onot be disturbed and shall be provided with a <br /> o' .250-foot protective buffer until and unless <br /> 5' the Technical Advisory Committee,with the <br /> concurrence of the permitting agencies' <br /> CL representatives on the Technical Advisory <br /> Committee,or a qualified biologist approved <br /> $ by the permitting agencies,verifies through <br /> noninvasive means that either(1)the birds <br /> an have not begun egg laying or(2)juveniles <br /> M from the occupied burrows are foraging <br /> y independently and are capable of <br /> :E independent survival.After the fledglings <br />