Laserfiche WebLink
M <br /> a <br /> cQ' D <br /> o College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Q <br /> j lmplementa6on Implernehtation.&Verlfication <br /> Mitigation Measure Timing/Schedule Responsibility. Date <br /> Action . Completed <br /> Q are capable of independent survival,the <br /> @ burrow can be destroyed. <br /> 4.10-6 Biological Resources---Conversion of Common Before and during SJCOG,in <br /> Nesting Raptor Habitat and Possible Loss of construction consultation with DFG <br /> cc <br /> -0 Active Nests <br /> 23 <br /> < The College Park developers shall request, <br /> coverage under the SJMSCP,and fees shall be <br /> paid in the amount determined by SJCOG during <br /> the application and review process for each <br /> project under College Park.Potential nest sites <br /> for all tree-nesting species are scattered <br /> throughout much of the College Park site,but are. <br /> CO concentrated along Grant Line Road and at Grant <br /> Line Village, Suitable nesting habitat for <br /> northern harrier is provided by all field crops and <br /> n fallow fields.During the SJMSCP application <br /> a process, SJCOG will determine whether that <br /> rn <br /> specific fic project site supports suitable nesting <br /> habitat.If SJCOG determines suitable habitat is <br /> P. present on or adjacent to a given project site,the <br /> ? SJMSCP incidental take avoidance and <br /> o minimization measures described below for <br /> C nesting raptors shall be implemented.Additional <br /> measures below shall be implemented to avoid <br /> loss of active nests of common raptor species, <br /> which are not covered under the SJMSCP.but are <br /> co protected under the California Fish and Game <br /> m-0 Code,The project applicants shall retain <br /> CD qualified biologists to conduct all pre- <br /> C., construction surveys. <br /> < White-tailed Kite.If project construction begins <br /> during the nesting season(February 15– <br /> `` — September 15),pre-construction surveys shall be <br />