Laserfiche WebLink
K rn <br /> n <br /> o College Park at Mountain House Specific PIan III <br /> Mitigation Monitoring and,Reporting r ogram <br /> Implementation Implementation Verification <br /> Mitigation Measure Timing/Schedule <br /> Responsibility Date. <br /> Action <br /> Completed <br /> b. during the nesting season(February I5–August <br /> 31),pre-construction surveys shall be conducted <br /> CD <br /> g during the nesting season in suitable nesting <br /> habitat within 500 feet of areas of project . <br /> activity..The survey shall be conducted within <br /> the 2 weeks before construction or tree removal <br /> begins.If any active nests are found,a setback of <br /> 200 feet from each nest shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests.This <br /> setback applies whenever construction or other <br /> No ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied.Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> 0 4.10-7 Biological Resources—Conversion of Other Before construction SJCOG, in <br /> Special-Status Nesting Bird Habitat and Possible (surveys shall be consultation with DFG <br /> S° Loss of Active Nests conducted 2 weeks <br /> The College Park developers shall request coverage prior to,construction <br /> under the SJMSCP,and fees shall be paid in the activities) <br /> amount determined by SJCOG during the application <br /> and review process for each project under College <br /> Park.During the SJMSCP application'process, <br /> SJCOG will determine whether that specific project <br /> c site supports suitable habitat for loggerhead shrike, <br /> co C California horned lark,or tricolored blackbird.If <br /> o cn SJCOG determines suitable habitat is present on or <br /> adjacent to a given project site,the following <br /> 0 SJMSCP incidental take avoidance and minimization <br /> 0 - measures shall be implemented by the project <br /> applicants in consultation with a qualified biologist. <br /> < Loggerhead Shrike.If project construction <br />