My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006253 (2)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
20058
>
2600 - Land Use Program
>
PA-0600363
>
SU0006253 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 11:40:20 AM
Creation date
9/5/2019 10:46:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006253
PE
2611
FACILITY_NAME
PA-0600363
STREET_NUMBER
20058
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
APN
20907026
ENTERED_DATE
9/15/2006 12:00:00 AM
SITE_LOCATION
20058 W GRANT LINE RD
RECEIVED_DATE
9/12/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\20058\PA-0600363\SU0006253\REV SITE PLN.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1078
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cn n <br /> � o <br /> College Park at Mountain House Specific Plan III <br /> CD <br /> MitigationMonitoring and Reporting Program. <br /> [mplernenfation.&Verification <br /> r7 m Implementation <br /> Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> °i conducted to investigate all potential nesting <br /> = trees on the project site(e.g.,especially tree-tops <br /> N15-59 feet above the ground in oak,willow, <br /> ro eucalyptus,cottonwood,or other deciduous <br /> trees), whenever white-tailed kites are noted on- <br /> 0. site or within the vicinity of the site during the <br /> nesting season.A setback of 100 feet from white- <br /> tailed kite nesting areas shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests.This <br /> setback applies whenever construction or other <br /> ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> < Northern Harrier.If project construction begins <br /> during the nesting season(February 15—August <br /> 31),pre-construction surveys shall be conducted <br /> during the nesting season in suitable nesting <br /> habitat within 500 feet of areas of project <br /> o activity.The survey shall be conducted within <br /> the 2 weeks before construction begins.A <br /> �. setback of 500 feet from northern harrier nesting <br /> areas shall be established and maintained during <br /> athe nesting season for the period encompassing <br /> nest building and continuing until fledglings <br /> leave nests.This setback applies whenever <br /> construction or other ground-disturbing activities <br /> ca must begin during the nesting season in the <br /> presence of nests that are known to be occupied. <br /> cn 0 Setbacks shall be marked by brightly colored <br /> temporary fencing. <br /> < Common Raptors.If project construction begins <br />
The URL can be used to link to this page
Your browser does not support the video tag.