Laserfiche WebLink
KM <br /> 0 <br /> a <br /> o' <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&Verification <br /> o Mitigation Measure Timing/Schedule Implementation <br /> Responsibility Action Date <br /> Completed <br /> w <br /> CL action required"in the regulatory agency <br /> X databases,and the facilities that are the source of <br /> CD <br /> any contamination have been removed in <br /> accordance with applicable regulations.The <br /> project developers may attempt to advance the <br /> o <br /> above, if they desire,by conducting their own <br /> investigations of these sites in coordination with <br /> the property owners and regulatory agencies, and <br /> working with the regulatory agencies to <br /> accomplish the above. <br /> < Before demolition,renovation, or modification of <br /> structures on the project site and off-site <br /> infrastructure sites constructed before 1981 <br /> (parcels containing such structures are listed in <br /> Table 4.9-2 of the EIR),the project developers <br /> shall contract with qualified hazardous materials <br /> o experts to survey,these buildings for asbestos and <br /> c(D lead-based paint.Demolition,renovation, or <br /> m modification of any structures identified as <br /> containing asbestos or lead-based paint shall be <br /> performed by a licensed asbestos and lead-based <br /> 94 <br /> 9 paint abatement contractor in accordance with <br /> 0 applicable regulations. <br /> _ 4.4-4 Public Health and Safety—Locate a School Site in During design phase SJCCDD,in 1 <br /> an Area of Potential Hazards conjunction with the <br /> < The College Park developers shall have a developer and a <br /> ro preliminary Endangerment Assessment(PEA) qualified hazardous <br /> o prepared by a qualified hazardous materials materials expert; in <br /> consultant for the school located near the Lucky J consultation with CDE <br /> Dairy, if required by California Department of and DTSC <br /> o -0 Education(CDE). The PEA shall be prepared in <br /> accordance with CDE and Department of Toxic <br /> `� = Substances Control(DTSC)requirements and <br />