Laserfiche WebLink
Cn 0 <br /> a) o <br /> =3 _ <br /> CD <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o m Implementation Implementation&Verification <br /> c Mitigation Measure Timing/Schedule Date <br /> O Responsibility Action <br /> Completed <br /> �• employing one of several methods outlined in <br /> = Section 5.2.4.15 of the SJMSCP.These include <br /> retention of tall.vegetation,regular discing of the <br /> 0 site,or use of chemicals or traps to kill ground <br /> msquirrels; <br /> <?. ► Pre-construction surveys for burrowing owls <br /> shall be conducted where project construction <br /> v activities would occur within 75 meters of <br /> =3_ suitable habitat(based on SJCOG review).The. <br /> survey shall be conducted within 2 weeks of the <br /> beginning of construction. If burrowing owls are <br /> found,the following measures shall be <br /> implemented: <br /> • During the nonbreeding season(September 1 <br /> through January 31),burrowing owls <br /> occupying the project site shall be evicted <br /> from the project site by passive relocation,as <br /> described in the DFG's Slaff Report on <br /> Burrowing Owls(DFG 1995). <br /> oDuring the breeding season(February i <br /> through August 31),occupied burrows shall <br /> not be disturbed and shall be provided with a <br /> 0 250-foot protective buffer until and unless <br /> the Technical Advisory Committee,with the <br /> m concurrence of the permitting agencies' <br /> Q representatives on the Technical Advisory <br /> Corrunittee,or a qualified biologist approved <br /> CD <br /> by the permitting agencies,verities through <br /> noninvasive means that either(1)the birds <br /> have not begun egg laying or(2)juveniles <br /> -a <br /> ca m4 from the occupied burrows are foraging <br /> 45 independently and are capable of <br /> independent survival.After the fledglings <br />