Laserfiche WebLink
E: rn <br /> D <br /> a <br /> o <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&Verification <br /> entation <br /> Mitigation Measure Timing/Schedule Responsibility Date <br /> A Y Action. Completed <br /> m <br /> are capable of independent survival,the <br /> CL <br /> rn burrow can be destroyed. <br /> a <br /> 4.10-6 Biological Resources—Conversion of Common Before and during SJCOG, in <br /> Nesting Raptor Habitat and Possible Loss of construction consultation with DFG <br /> Active Nests <br /> < The College Park developers shall request <br /> coverage under the SJMSCP, and fees shall be <br /> 3 paid in the amount determined by SJCOG during <br /> the application and review process for each <br /> project under College Park.Potential nest sites <br /> for all tree-nesting species are scattered <br /> throughout much of the College Park site,but are <br /> CO concentrated along Grant Line Road and at Grant <br /> Line Village. Suitable nesting habitat for <br /> northern harrier is provided by all field crops and <br /> n fallow fields. During the SJMSCP application <br /> process,SJCOG will determine whether that <br /> CD <br /> specific project site supports suitable nesting <br /> habitat, If SJCOG determines suitable habitat is <br /> present on or adjacent to a given project site,the <br /> SJMSCP incidental take avoidance and <br /> o nunimization measures described below for <br /> nesting raptors shall be implemented.Additional ) <br /> a� measures below shall be implemented to avoid <br /> = loss of active nests of common raptor species, <br /> v which are not covered under the SJMSCP but are <br /> M protected under the California Fish and Game <br /> va Code.The project applicants shall retain <br /> n qualified biologists to conduct all pre- <br /> 3 r construction surveys. <br /> cm < White-tailed Kite.If project construction begins <br /> during the nesting season(February 15– <br /> `` — September 15),pre-construction surveys shall be <br />