My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006253 (2)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
20058
>
2600 - Land Use Program
>
PA-0600363
>
SU0006253 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 11:40:20 AM
Creation date
9/5/2019 10:46:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006253
PE
2611
FACILITY_NAME
PA-0600363
STREET_NUMBER
20058
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
APN
20907026
ENTERED_DATE
9/15/2006 12:00:00 AM
SITE_LOCATION
20058 W GRANT LINE RD
RECEIVED_DATE
9/12/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\20058\PA-0600363\SU0006253\REV SITE PLN.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1078
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KM <br /> = a <br /> c7o' n <br /> o College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> Implementation Implementation&Verification <br /> Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> - Kit Fox Habitat and Possible Occupied Den (surveys shall be consultation with DFG <br /> X Destruction conducted 2 weeks to <br /> CD <br /> The College Park developers shall request coverage 30 days before <br /> under the SJMSCP,and fees shall be paid in the construction <br /> amount determined by San Joaquin County of activities) <br /> o <br /> Government(SJCOG)during the application and <br /> review process for each project under College Park. <br /> Because the entire College Park site is located within <br /> the SJMSCP's Central/Southwest Transition Zone,the <br /> following SJMSCP incidental take avoidance and <br /> minimization measures shall be implemented for all <br /> projects: <br /> N < Pre-construction surveys shall be conducted 2 <br /> weeks to 30 days before commencement of <br /> ground disturbance. Surveys shall be conducted <br /> by a qualified biologist.If the surveys identify <br /> o potential dens(potential dens are defined as <br /> cCD burrows at least 4 inches in diameter that open up <br /> cn within 2 feet),potential den entrances shall be <br /> m dusted for 3 calendar days to register track of any <br /> m <br /> San Joaquin kit fox present. If no San Joaquin kit <br /> fox activity is identified,potential dens may be <br /> c destroyed. If San Joaquin kit fox activity is ,rr- <br /> identified, then dens shall be monitored to 1 <br /> determine if occupation is by an adult fox only or <br /> z is a natal den(natal dens usually have multiple <br /> Cn 0 <br /> openings).If the den is occupied by an adult only, <br /> CD <br /> <-. Cn the den may be destroyed when the adult fox has <br /> M rn moved or is temporarily absent.If the den is a <br /> _. natal den,a buffer zone of 250 feet shall be <br /> 0 -r maintained around the den until the biologist <br /> determines that the den has been vacated. <br /> < Where San Joaquin kit fox are identified,the <br /> provisions of the Standardized Recommendations 1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.