Laserfiche WebLink
cn 0 <br /> Aa o <br /> v m College Park at Mountain House Specific Plan III <br /> m Mitigation Monitoring and Reporting Program <br /> Implementation&Verification <br /> Implementation <br /> Mitigation Measure Timing/Schedule Date <br /> • 5 Responsibility Action Completed. : <br /> Lu. for Protection of the San Joaquin Kit Fox before <br /> Lu <br /> a or during Ground Disturbance(US Fish and <br /> c Wildlife Service[FWS] 1999b)shall apply _ r <br /> LD _ (except that pre-construction survey protocols <br /> shall remain as established in the above <br /> CD <br /> 0. paragraph).These standards include provisions for <br /> 0 educating construction workers regarding the kit <br /> jfox,keeping heavy equipment operating at safe <br /> speeds,checking construction pipes for kit fox <br /> occupation during construction,and similar low- <br /> or no-cost activities. <br /> 4.10-10 Biological Resources—Loss or Alteration of Before construction SJCOG,in <br /> w Jurisdictional Waters of the United States coordination with <br /> Impacts to waters of the United States are not currently DFG,USACE and/or <br /> mitigated by participation in the SJMSCP,Therefore, RWQCB <br /> the College Park developers shall implement the <br /> following measures: <br /> < Before implementation of any Tentative Map or <br /> development project(if no Tentative Map)under <br /> o the College Park project,a formal Section 404 <br /> delineation of waters of the United States, <br /> 0 including wetlands,shall be conducted by a <br /> o qualified biologist in the Tentative Map or <br /> development project area if the area includes <br /> features that are potentially subject to United <br /> C- States Army Corp of Engineers(USACE) <br /> cXo jurisdiction(ponds, irrigation canals,and <br /> drainages).The delineation shall be submitted to <br /> USACE for verification. <br /> < If,based on the verified delineation, it is <br /> co odetermined that fill of waters of the United States <br /> > would result from the Tentative Map or <br /> development project,authorization for such fill <br />