My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006253 (2)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
20058
>
2600 - Land Use Program
>
PA-0600363
>
SU0006253 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 11:40:20 AM
Creation date
9/5/2019 10:46:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006253
PE
2611
FACILITY_NAME
PA-0600363
STREET_NUMBER
20058
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
APN
20907026
ENTERED_DATE
9/15/2006 12:00:00 AM
SITE_LOCATION
20058 W GRANT LINE RD
RECEIVED_DATE
9/12/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\20058\PA-0600363\SU0006253\REV SITE PLN.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1078
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> A <br /> 3: m <br /> r.: 0 <br /> o. College Park at Mountain House Specific Plan III <br /> :3 Mitigation Monitoring and Reporting Program <br /> ImplementationImplementation&Verification <br /> o Mitigation Measure Timing/Schedule Responsibility it Date <br /> p y Action. <br /> Completed <br /> CL 10- Mobile-Source TAC Endssions—The College <br /> M Park applicants for industrial or commercial land <br /> o uses shall coordinate with the S.IVAPCD to <br /> assess situations in which toxic risk from diesel <br /> particulate matter(PM)may occur and to review <br /> omethodologies that may become available to <br /> estimate the risk.The developers shall implement <br /> 3 any project-level measures adopted by the. <br /> SJVAPCD to reduce mobile-source TACs <br /> emissions. <br /> 4.12-3 Air Quality—Possible Temporary and Occasional Before and during SJCCDD,in <br /> Exposure of New Sensitive Uses to Odors construction conjunction with the <br /> N The College Park developers shall not develop any developer <br /> new residential uses within 1,000 feet of the two <br /> existing on-site dairies until such time as the diaries <br /> cease operation and the dairy waste ponds and animal <br /> o refuse piles are removed. <br /> CD <br /> 4.12-5 Air Quality—Increased Tong-Term Regional Before construction SJVAPCD, in <br /> Emissions of Criteria Pollutants begins and during conjunction with the <br /> 51L The College Park developers shall implement all of construction developer <br /> ai the mitigation measures as recommended in the <br /> 3 Guide for Assessing and Mitigating Air Quality <br /> Impacts(SJVAPCD 1998).Many of these measures <br /> v are already included in the proposed project design <br /> = and/or are already required by the MHMP and by <br /> N mitigation in the MHMP and Delta College EIAs. <br /> CD <br /> � 0 <br /> 0 -0 <br /> a� (p <br /> C7 � <br /> o <br /> c � <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.