My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006253 (2)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
20058
>
2600 - Land Use Program
>
PA-0600363
>
SU0006253 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 11:40:20 AM
Creation date
9/5/2019 10:46:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006253
PE
2611
FACILITY_NAME
PA-0600363
STREET_NUMBER
20058
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
APN
20907026
ENTERED_DATE
9/15/2006 12:00:00 AM
SITE_LOCATION
20058 W GRANT LINE RD
RECEIVED_DATE
9/12/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\20058\PA-0600363\SU0006253\REV SITE PLN.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1078
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CnC7 <br /> m o <br /> CD <br /> W (D College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> C') W Implementation&Verification <br /> C) Implementation <br /> c E: Mitigation Measure Timing/Schedule <br /> C, ResponsibilityAction Date <br /> Completed. <br /> '- 4.13. NOISE <br /> 0 4.13-1 Noise—Generation of Temporary Construction During construction SJCCDD, in <br /> ,.� Noise, -::. _ conjunction with the <br /> < Limit project construction activities to the hours developer <br /> mbetween 6:00 a.m.and 9:00 p.m. <br /> < Comply with the San Joaquin County <br /> Development Title for all construction activities. <br /> < Equip all construction vehicles or equipment, <br /> fixed or mobile,with properly operating and <br /> maintained mufflers and acoustical shields or <br /> shrouds, in accordance with manufacturers' <br /> w recommendations. <br /> < Arrange all construction equipment and truck <br /> routes to minimize travel adjacent to occupied <br /> residences. <br /> < Locate stationary construction equipment and <br /> staging areas as far as possible.from sensitive <br /> receptors.Temporary acoustic barriers may be <br /> 9 _ installed around stationary equipment, if <br /> o necessary. <br /> E 4.13-2 Noise—Generation of New Stationary-Source During design phase SJCCDD,in <br /> �. Noise and during conjunction with the <br /> F The project applicants shall incorporate the measures construction developer <br /> c� identified below into the project design. <br /> a� <br /> C- Commercial,Office,and Industrial Uses <br /> 70 <br /> CD Industrial and commercial land uses proposed as part <br /> 70 <br /> 0 of the College Park project shall be designed to <br /> ensure that outdoor equipment does not result in an <br /> v exceedance of 55 dBA Ley during daytime hours <br /> M (7:00 a.m. to 10:00 p.m.)or 50 dBA Leq during <br /> 3 > nighttime hours(10:00 p.m. to 7:00 a.m.)at off-site <br /> noise-sensitive receptors, In addition,design and <br /> ti <br />
The URL can be used to link to this page
Your browser does not support the video tag.