Laserfiche WebLink
i <br /> KM <br /> ;: Q <br /> cn' A <br /> o College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> K <br /> o Mitigation Measure Timing/Schedule Implementation <br /> Implementation&Verification <br /> Date <br /> Responsibility Action Completed <br /> Q 4.134 Noise—Compatibility of Proposed Land Uses After construction SJCCDD, in <br /> exceeding Predicted Noise Levels conjunction with the <br /> o The College Park developers shall implement the developer;in <br /> following measures: consultation with a <br /> < Traffic Noise--Arterials.Before occupancy of qualified acoustical <br /> 23 the first residence proposed under the College consultant <br /> n� <br /> Park project along each of the seven arterial <br /> segments identified in Table 4.13-11 of the EIR, <br /> a sound barrier shall be constructed by the <br /> College Park developers along that arterial <br /> segment.The noise barrier may consist of a wall, <br /> berm,or combination thereof. The exact location, <br /> ow, height and character of the sound barrier shall be <br /> determined by a noise consultant approved by the <br /> County.The sound barrier shall reduce outdoor <br /> noise levels at the center of backyards of <br /> o proposed adjacent single-family residences to <br /> CD below 65 dBA Ld,/CNEL and as close to 60 dBA <br /> CD Ldp/CNEL as feasible.This mitigation shall be <br /> 0 funded through fair-share payments by the <br /> College Park developers. <br /> c r <br /> as <br /> z <br /> (n 0 <br /> v CA <br /> CD <br /> c– C/) <br /> c. <br /> 5 � <br /> O <br /> C � <br /> 3 _ <br /> p <br />