Laserfiche WebLink
i <br /> Rr• <br /> l J <br /> a) Q <br /> CD <br /> C_ <br /> College Park at Mountain House Specific Plan H1 <br /> v Mitigation Monitoring and Reporting Program <br /> v Implementation&Verification <br /> C' .� Implementation <br /> Mitigation Measure Timing/Schedule Date <br /> c Responsibility Action <br /> �< Completed.. <br /> �• land uses,the operation of on-site landscape <br /> o maintenance equipment shall be limited to the <br /> �. least noise-sensitive periods of the day,between <br /> CD the hours of 7:00 a.m. and 10:00 p.m. <br /> CD 4.13-3 Noise—Increased Traffic Noise After construction S.ICCDD, in <br /> The project applicants shall implement the measures conjunction with the D <br /> _U identified below. developer <br /> < Before occupancy of the first residence at <br /> College Park,a noise barrier shall be constructed <br /> by the College Park developers between the five <br /> existing residences located on the north side of <br /> Grant Line Road between Central Parkway and <br /> the Alameda County line(Receptor 14 in Figure <br /> 4.13-2 of the FIR)and the northern travel lane of <br /> Grant Line Road.The noise barriers may consist <br /> of a wall,berm,or combination thereof.The <br /> exact location,height,and character of the noise <br /> barrier shall be determined by a noise consultant <br /> ' approved by the County.The sound barrier shall <br /> Q reduce outdoor noise levels at the center of the <br /> front yards of the five existing residences to <br /> o below 65 dBA Ldn/CNEL.If Grant Line Road is <br /> widened at this location subsequent to <br /> construction of the sound barrier but before <br /> removal of the five residences under Specific <br /> CL Plan II,the sound barrier shall be relocated, as <br /> CD <br /> M required.If the five existing residences are <br /> 0 removed under Specific Plan II before occupancy <br /> of the first residence under the College Park <br /> project,this mitigation measure shall not require <br /> cn mm implementation.This mitigation shall be funded <br /> 3 through fair-share payments by the College Park <br /> developers. <br />