Laserfiche WebLink
for the project . The Checklist concluded that: 1)the project is a subsequent activity <br /> that is within.the scope of the Specific Plan III EIR(SPIIIEIR); 2)there are no <br /> effects of the project that were not examined in the SPIIIEIR .3) and no new <br /> mitigation is required for the project. Consequently,.as provided.by CEQA <br /> Guidelines Section 15168 (c),no new environmental document is required; and <br /> 7. Authorize and direct the Chairman of the Board of Supervisors to sign the <br /> Development Agreement by and between County of San Joaquin and Golden <br /> State Investments II, LP. <br /> BACKGROUND: <br /> The project consists of a Major Subdivision application, a Master Plan Amendment, a Specific <br /> Plan M Amendment, and a Development Agreement for a 12.72 acre parcel. Collectively,these <br /> applications are referred to as the "Altamont Heights Project". <br /> General Plan,Master Plan, and Specific Plan III Amendments <br /> The General Plan provides that the General Plan Community Plan 2010 Map for Mountain <br /> House is the Master Specific Plan Map for Mountain House. Consequently, any revisions to <br /> ISI <br /> the Master Plan Map (i.e., Figure 3.5—Master Plan Designations and Figure 3.8—Master <br /> Plan Designations, South Area)would automatically revise the General Plan Community <br /> Plan 2010 Map for Mountain House. However, any such revisions would need to be <br /> included as part of a General Plan update cycle. <br /> The Master Plan and Specific Plan III amendments would revise the various map figures <br /> and tables of their respective documents to eliminate the drainage swale (Le.,the area <br /> shown on both the Master Plan and Specific Plan III land use maps as Resource <br /> Conservation [OS/RC], and on the Specific Plan III zoning map as Public Facility[P-F]). <br /> With that revision,the entire project site would be designated as Residential, Law and <br /> Medium Density(R/L&R/M)on the Master Plan and Specific Plan III land use maps, and <br /> zoned Residential Low Density(R-L). In addition to these plan amendments, the <br /> neighborhood entry at the intersection of the collector street and the Delta College <br /> campus parcel is proposed to be deleted. Other minor changes would also be made <br /> consistent with past actions by the Board of Supervisors. <br /> Subdivision <br /> The Tentative Map would subdivide the property into 53 single family residential lots (See <br /> figures 3 and 4 in the staff report). The Tentative Map reflects a mix of lot sizes ranging <br /> from 5,745 square feet to 13,452 square feet. <br /> Development Agreement <br /> The Development Agreement by and between the County of San Joaquin and Golden <br /> State Investments II, LP would be applicable to the development of the project site. The <br /> Development Agreement would establish the timing of infrastructure extension; identify the <br /> obligations for participation in off-site infrastructure improvements, dedications and fair- <br /> share financing; and set requirements for school mitigation and participation in the San <br /> 2 <br />