Laserfiche WebLink
Cn 0 <br /> m o <br /> d m College Park at Mountain House Specific Plan M <br /> Mitigation Monitoring and Reporting Program <br /> Implementation&Verification <br /> ImplementationMiti <br /> Mitigation Measure I7:iming/Schedule DateoResponsibility Action <br /> ~[ Completed <br /> 4.2 LAND USE <br /> 0 4.2-1 Land Use and Agriculture----Conflict with Existing Before and during San Joaquin County <br /> y Land Uses construction,and Community <br /> The College Park developers shall implement the During design phase Development <br /> CD following measures: Department <br /> < Fence off the two on-site Byron-Bethany (SJCCDD), in <br /> -p Irrigation District(BBID)canals from proposed conjunction with the <br /> urban development until such time as the canals developer,and in <br /> are filled.The fencing shall be sufficient-to block coordination with <br /> access to the canals by all except BBID BBID <br /> personnel and other authorized persons,and shall <br /> be developed in coordination with BBID to <br /> `-' ensure that BBID has continued access to the <br /> canals for maintenance activities. <br /> < Implement Mitigation Measure 4.9-5,identified <br /> in Section 4.9,"Public Health and Safety,"to <br /> ensure that the proposed residences are not <br /> exposed to an explosion hazard from the natural <br /> v gas pipelines within the PG&E—Chevron <br /> o easement that bisects the project site. <br /> < Identify an agricultural buffer of no less than 100 <br /> feet at the time of Tentative Map approval for <br /> aany new units in the residential area in and south <br /> of Grant Line Village and adjacent to the County <br /> v line. <br /> a. <br /> CD <br /> cQ <br /> rn <br /> .n . <br />