Laserfiche WebLink
K rn <br /> Q <br /> cn' A <br /> ' College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o Im lementation&Verification <br /> Implementation p <br /> 0 Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> 4.2-4 Land Use and Agri Substantially After discontinuance SJCCDD,in <br /> � g Y . <br /> with Existing Agricultural Zoning or Williamson of interim land conjunction with the <br /> CD <br /> Act Contracts disposal developer <br /> The project applicants shall implement the following <br /> mitigation measure: <br /> c < At such time as the interim land disposal of <br /> ca treated wastewater at the Pombo property is <br /> discontinued, GNK,LLC shall remove the 30- <br /> acre storage pond and restore the storage-pond <br /> site to agricultural use(i.e.,feed crops). <br /> 4.2-5 Land Use and Agriculture—Conflicts with Before construction SJCCDD,in <br /> Adjacent Agricultural Operations conjunction with the <br /> < Before development, the project developers shall developer,and in <br /> provide for the continued provision of irrigation coordination with <br /> water to downstream agriculture reliant on the BBID <br /> n water from the canals by the installation of <br /> o pipelines and other means.The filling of the <br /> irrigation canals shall be approved by BBID. <br /> cn <br /> m <br /> 4.6 CULTURAL RESOURCES <br /> 4.6-2 Cultural Resources--Potential. During construction SJCCDD,in <br /> Destruction/Damage to Undiscovered Cultural conjunction with the <br /> a Resources developer,and in <br /> if discovery of unknown cultural materials is made conjunction with <br /> R1• during construction,ground-disturbing activities at qualified <br /> = the construction site where the discovery was made archaeologist,if <br /> ashall be halted.The College Park developers.or needed. <br /> cnCn construction contractor shall contact the San Joaquin <br /> ro County Community Development Department <br /> a; (SJCCDD) immediately,and a qualified professional <br /> archaeologist acceptable to County staff shall be <br /> 0 notified and retained by the College Park developer. <br /> ,{ = The archaeologist shall determine whether the <br /> resource represents a"unique archaeological <br />